Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bin wall construction method for fabricated horizontal warehouse
The invention relates to a warehouse wall construction method of an assembly type horizontal warehouse, which comprises the following steps of: 1, fixing stand column units which are arranged on a foundation at intervals, 2, finishing the installation of a first layer of ring beams and a second layer of ring beams, and enclosing a prefabricated wallboard installation space among the first layer of ring beams, the second layer of ring beams and stand column wallboards of two adjacent stand column units; 3, a concrete prefabricated wallboard is installed in the corresponding prefabricated wallboard installation space, and 4, installation of a third-layer ring beam is completed, then the concrete prefabricated wallboard is installed between the third-layer ring beam and the second-layer ring beam, the step is repeated until installation of the Nth-layer ring beam is completed, and the Nth-layer ring beam is installed. And completing the installation of the concrete prefabricated wallboard between the Nth layer of ring beam and the (N-1) th layer of ring beam. According to the warehouse wall construction method of the fabricated horizontal warehouse, the cast-in-place and masonry construction amount can be reduced, and meanwhile the horizontal anti-pressure ability can be improved.
本发明涉及一种装配式平房仓的仓壁施工方法,第一步,在地基上固定间隔设置的立柱单元,第二步,完成第一层圈梁和第二层圈梁的安装,第一层圈梁、第二层圈梁和相邻两个立柱单元的立柱墙板之间围成预制墙板安装空间;第三步,在对应的预制墙板安装空间内安装一个混凝土预制墙板,第四步,完成第三层圈梁的安装,然后在第三层圈梁与第二层圈梁之间安装混凝土预制墙板,重复该步骤,直至完成第N层圈梁的安装,完成第N层圈梁与第N‑1层圈梁之间混凝土预制墙板的安装。本发明提供了一种可以减少现场浇筑、砌筑施工量,同时有利于提高水平抗压能力的装配式平房仓的仓壁施工方法。
Bin wall construction method for fabricated horizontal warehouse
The invention relates to a warehouse wall construction method of an assembly type horizontal warehouse, which comprises the following steps of: 1, fixing stand column units which are arranged on a foundation at intervals, 2, finishing the installation of a first layer of ring beams and a second layer of ring beams, and enclosing a prefabricated wallboard installation space among the first layer of ring beams, the second layer of ring beams and stand column wallboards of two adjacent stand column units; 3, a concrete prefabricated wallboard is installed in the corresponding prefabricated wallboard installation space, and 4, installation of a third-layer ring beam is completed, then the concrete prefabricated wallboard is installed between the third-layer ring beam and the second-layer ring beam, the step is repeated until installation of the Nth-layer ring beam is completed, and the Nth-layer ring beam is installed. And completing the installation of the concrete prefabricated wallboard between the Nth layer of ring beam and the (N-1) th layer of ring beam. According to the warehouse wall construction method of the fabricated horizontal warehouse, the cast-in-place and masonry construction amount can be reduced, and meanwhile the horizontal anti-pressure ability can be improved.
本发明涉及一种装配式平房仓的仓壁施工方法,第一步,在地基上固定间隔设置的立柱单元,第二步,完成第一层圈梁和第二层圈梁的安装,第一层圈梁、第二层圈梁和相邻两个立柱单元的立柱墙板之间围成预制墙板安装空间;第三步,在对应的预制墙板安装空间内安装一个混凝土预制墙板,第四步,完成第三层圈梁的安装,然后在第三层圈梁与第二层圈梁之间安装混凝土预制墙板,重复该步骤,直至完成第N层圈梁的安装,完成第N层圈梁与第N‑1层圈梁之间混凝土预制墙板的安装。本发明提供了一种可以减少现场浇筑、砌筑施工量,同时有利于提高水平抗压能力的装配式平房仓的仓壁施工方法。
Bin wall construction method for fabricated horizontal warehouse
一种装配式平房仓的仓壁施工方法
CHUAI JUN (Autor:in) / DUAN JUNFENG (Autor:in) / LIU YONGCHAO (Autor:in) / LI JUN (Autor:in) / WANG JIAN (Autor:in) / XIANG PENGFEI (Autor:in) / XU QIKENG (Autor:in) / YUAN QINGLI (Autor:in)
08.03.2024
Patent
Elektronische Ressource
Chinesisch
Fabricated horizontal warehouse wall construction method
Europäisches Patentamt | 2024
|Novel fabricated grain horizontal warehouse and construction method thereof
Europäisches Patentamt | 2024
|