Construction method for constructing underwater breakwater core by filling silt with geotextile tube bags
The invention discloses a construction method for constructing an underwater breakwater core by using a geotextile tube bag, which mainly comprises a geotextile tube bag structure form and a construction method, the geotextile tube bag is formed by weaving a polypropylene split film yarn machine-made material, and the construction method for constructing the breakwater core comprises the following specific steps: S1, fixing the geotextile tube bag in a construction prefabricated iron stand; the iron stand comprises a hoisting rope, a winding and unwinding chain and a bottom opening gate; s2, the fixed geotextile tube bags are filled with clay through an excavator; s3, a sealing bandage penetrates through an outer hole opening of the geotextile tube bag sealing bag body and is tightened; s4, a floating bottle is bound to a lifting lug at the upper right corner of the geotextile pipe bag, and positioning is convenient; and S5, the iron stand is hoisted to the designated position, the lifting hook is lowered, the bottom opening gate is opened, and the geotextile pipe bag falls to the target position in water. The method solves the problem that the stability and the shape of an underwater breakwater core constructed in the prior art are uncontrollable, and has the advantages of being high in construction efficiency and low in danger.
本发明公开了一种利用土工管袋构筑水下防波堤堤心的施工方法,主要包括土工管袋结构形式及施工方法,其中土工管袋是由聚丙烯裂膜丝机制材料编织而成,构筑堤心施工方法具体步骤为:S1、将土工管袋固定在施工预制铁架中,所述铁架包括吊装绳子、收放链、开底闸门;S2、利用挖机向固定后的土工管袋中充填粘土;S3、将封口绑带穿过土工管袋封口袋体外部孔口,扎紧;S4、在土工管袋右上角吊耳处绑上漂浮瓶,方便定位;S5、将铁架吊装至指定位置,吊钩下放,开底闸门打开,使土工管袋掉至水中目标位置。本发明解决了现有技术构筑水下防波堤堤心稳定性及形状不可控的问题,具有施工效率高且危险性低的特点。
Construction method for constructing underwater breakwater core by filling silt with geotextile tube bags
The invention discloses a construction method for constructing an underwater breakwater core by using a geotextile tube bag, which mainly comprises a geotextile tube bag structure form and a construction method, the geotextile tube bag is formed by weaving a polypropylene split film yarn machine-made material, and the construction method for constructing the breakwater core comprises the following specific steps: S1, fixing the geotextile tube bag in a construction prefabricated iron stand; the iron stand comprises a hoisting rope, a winding and unwinding chain and a bottom opening gate; s2, the fixed geotextile tube bags are filled with clay through an excavator; s3, a sealing bandage penetrates through an outer hole opening of the geotextile tube bag sealing bag body and is tightened; s4, a floating bottle is bound to a lifting lug at the upper right corner of the geotextile pipe bag, and positioning is convenient; and S5, the iron stand is hoisted to the designated position, the lifting hook is lowered, the bottom opening gate is opened, and the geotextile pipe bag falls to the target position in water. The method solves the problem that the stability and the shape of an underwater breakwater core constructed in the prior art are uncontrollable, and has the advantages of being high in construction efficiency and low in danger.
本发明公开了一种利用土工管袋构筑水下防波堤堤心的施工方法,主要包括土工管袋结构形式及施工方法,其中土工管袋是由聚丙烯裂膜丝机制材料编织而成,构筑堤心施工方法具体步骤为:S1、将土工管袋固定在施工预制铁架中,所述铁架包括吊装绳子、收放链、开底闸门;S2、利用挖机向固定后的土工管袋中充填粘土;S3、将封口绑带穿过土工管袋封口袋体外部孔口,扎紧;S4、在土工管袋右上角吊耳处绑上漂浮瓶,方便定位;S5、将铁架吊装至指定位置,吊钩下放,开底闸门打开,使土工管袋掉至水中目标位置。本发明解决了现有技术构筑水下防波堤堤心稳定性及形状不可控的问题,具有施工效率高且危险性低的特点。
Construction method for constructing underwater breakwater core by filling silt with geotextile tube bags
一种利用土工管袋充填淤泥构筑水下防波堤堤心的施工方法
HUANG ZHAOJIE (Autor:in) / YAN JUN (Autor:in) / CHEN QIONG (Autor:in) / ZUO JIANMING (Autor:in) / LUO LIANGMING (Autor:in) / XIANG YUHONG (Autor:in) / LUO LEI (Autor:in) / ZHANG MIN (Autor:in) / TANG HUIHENG (Autor:in) / GUO RUI (Autor:in)
12.03.2024
Patent
Elektronische Ressource
Chinesisch
Construction method for building breakwater through geotextile tube bag
Europäisches Patentamt | 2015
|Underwater Geotextile Tube Construction Apparatus and Method
Europäisches Patentamt | 2021
|Breakwater Innovation Design Using a Geotextile Tubeasa Core
TIBKAT | 2017
|