Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Precast pile model test box with pile body positioning device
The invention discloses a precast pile model test box with a pile body positioning device. A traditional pile pressing method depends on a tester to centralize a model pile with hands, and a pile body is ensured to be vertical through visual inspection or by means of a hanging plumb line. The device comprises a frame box body, and a pile body positioning device is arranged at the top of the frame box body; the precast pile is vertically positioned through the pile body positioning device; a high-strength tempered glass plate is arranged on the frame box body, and a light winch and a watertight door are arranged on the two opposite sides of the frame box body respectively. A set of pile body positioning device is installed on the upper portion of the frame box body, it is guaranteed that pile body deflection does not occur in the pile pressing process of a pile foundation test, and the test efficiency and the test accuracy are improved; the clamp module is of an up-down symmetrical structure, and the model pile penetrates through the clamp module, is restrained by the rubber wheels in multiple directions, can only move in the axial direction of a pile body and does not incline.
本发明公开了一种带有桩体定位装置的预制桩模型试验箱。传统压桩方法依靠试验人员用手扶正模型桩,目测或借助悬吊铅垂线确保桩体的竖直。本发明包括框架箱体,框架箱体顶部设置有桩体定位装置;预制桩通过桩体定位装置实现竖直定位;框架箱体上设置有高强钢化玻璃板,框架箱体相对两侧分别设置有轻型卷扬机和水密门。本发明在框架箱体上部安装一套桩体定位装置,保证桩基试验的压桩过程不发生桩体歪斜,提高试验效率和试验精准度;夹具模块是一上下对称结构,模型桩穿过夹具模块,受到橡胶轮在多个方向的约束,只能沿桩体轴向运动,不会发生歪斜。
Precast pile model test box with pile body positioning device
The invention discloses a precast pile model test box with a pile body positioning device. A traditional pile pressing method depends on a tester to centralize a model pile with hands, and a pile body is ensured to be vertical through visual inspection or by means of a hanging plumb line. The device comprises a frame box body, and a pile body positioning device is arranged at the top of the frame box body; the precast pile is vertically positioned through the pile body positioning device; a high-strength tempered glass plate is arranged on the frame box body, and a light winch and a watertight door are arranged on the two opposite sides of the frame box body respectively. A set of pile body positioning device is installed on the upper portion of the frame box body, it is guaranteed that pile body deflection does not occur in the pile pressing process of a pile foundation test, and the test efficiency and the test accuracy are improved; the clamp module is of an up-down symmetrical structure, and the model pile penetrates through the clamp module, is restrained by the rubber wheels in multiple directions, can only move in the axial direction of a pile body and does not incline.
本发明公开了一种带有桩体定位装置的预制桩模型试验箱。传统压桩方法依靠试验人员用手扶正模型桩,目测或借助悬吊铅垂线确保桩体的竖直。本发明包括框架箱体,框架箱体顶部设置有桩体定位装置;预制桩通过桩体定位装置实现竖直定位;框架箱体上设置有高强钢化玻璃板,框架箱体相对两侧分别设置有轻型卷扬机和水密门。本发明在框架箱体上部安装一套桩体定位装置,保证桩基试验的压桩过程不发生桩体歪斜,提高试验效率和试验精准度;夹具模块是一上下对称结构,模型桩穿过夹具模块,受到橡胶轮在多个方向的约束,只能沿桩体轴向运动,不会发生歪斜。
Precast pile model test box with pile body positioning device
一种带有桩体定位装置的预制桩模型试验箱
DING ZIHAO (Autor:in)
15.03.2024
Patent
Elektronische Ressource
Chinesisch
Precast pile connecting piece, precast pile connecting structure and precast pile thereof
Europäisches Patentamt | 2022
|Precast pile with pile cap and construction method of precast pile
Europäisches Patentamt | 2023
|