Full-mechanized construction assembly type subway station and construction method
The invention discloses a fully mechanized construction fabricated subway station which comprises a left line tunnel, a right line tunnel, fabricated water collecting pits, underground passages, fabricated elevator shafts and a ground station hall, the left line tunnel and the right line tunnel are arranged side by side, the fabricated water collecting pits are arranged in the left line tunnel and the right line tunnel, and the underground passages are arranged in the fabricated elevator shafts. The left line tunnel and the right line tunnel are arranged on the ground station hall and used for collecting waste water generated by a station, the underground channel is connected with the left line tunnel and the right line tunnel, and the assembly type elevator shaft is communicated with the underground channel and the ground station hall. The construction method has the following advantages and effects that the whole subway station structure is constructed through a mechanical method, the construction efficiency is improved, the mechanization degree is high, the construction safety risk is reduced, the construction quality is improved, the labor operation intensity of workers is reduced, and the influence on the surrounding environment is small.
本发明公开了一种全机械化施工装配式地铁车站,包括左线隧道、右线隧道、装配式集水坑、地下通道、装配式电梯井以及地面站厅,所述左线隧道和所述右线隧道并列设置,所述装配式集水坑设置于所述左线隧道和所述右线隧道内,且用于收集车站产生的废水,所述地下通道连接所述左线隧道和所述右线隧道,所述装配式电梯井连通所述地下通道和所述地面站厅。本发明具有以下优点和效果:地铁车站结构全部采用机械法施工,提高了施工效率,机械化程度高,降低了施工安全风险,提高了施工质量,降低了工人劳动作业强度,对周边环境影响小。
Full-mechanized construction assembly type subway station and construction method
The invention discloses a fully mechanized construction fabricated subway station which comprises a left line tunnel, a right line tunnel, fabricated water collecting pits, underground passages, fabricated elevator shafts and a ground station hall, the left line tunnel and the right line tunnel are arranged side by side, the fabricated water collecting pits are arranged in the left line tunnel and the right line tunnel, and the underground passages are arranged in the fabricated elevator shafts. The left line tunnel and the right line tunnel are arranged on the ground station hall and used for collecting waste water generated by a station, the underground channel is connected with the left line tunnel and the right line tunnel, and the assembly type elevator shaft is communicated with the underground channel and the ground station hall. The construction method has the following advantages and effects that the whole subway station structure is constructed through a mechanical method, the construction efficiency is improved, the mechanization degree is high, the construction safety risk is reduced, the construction quality is improved, the labor operation intensity of workers is reduced, and the influence on the surrounding environment is small.
本发明公开了一种全机械化施工装配式地铁车站,包括左线隧道、右线隧道、装配式集水坑、地下通道、装配式电梯井以及地面站厅,所述左线隧道和所述右线隧道并列设置,所述装配式集水坑设置于所述左线隧道和所述右线隧道内,且用于收集车站产生的废水,所述地下通道连接所述左线隧道和所述右线隧道,所述装配式电梯井连通所述地下通道和所述地面站厅。本发明具有以下优点和效果:地铁车站结构全部采用机械法施工,提高了施工效率,机械化程度高,降低了施工安全风险,提高了施工质量,降低了工人劳动作业强度,对周边环境影响小。
Full-mechanized construction assembly type subway station and construction method
一种全机械化施工装配式地铁车站及建造方法
LIANG YU (Autor:in) / JIA BAOQING (Autor:in) / ZHAO HONGYAN (Autor:in) / MA QIANLI (Autor:in) / MA YUNXIN (Autor:in) / MAO LIKUN (Autor:in) / YANG FAN (Autor:in) / BIAN ZHENGTAO (Autor:in) / WANG MINWEI (Autor:in) / ZHANG DEQIANG (Autor:in)
19.03.2024
Patent
Elektronische Ressource
Chinesisch
Subway station building assembly type construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Subway station assembly type shop structure and construction method
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2022
|