Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Tunnel portal landslide starting mechanism test device
The embodiment of the invention provides a tunnel portal landslide starting mechanism testing device, and relates to the field of landslide starting mechanisms. The tunnel portal landslide starting mechanism test device comprises a base assembly, a material collection box assembly and a landslide assembly. The landslide assembly comprises a simulated landslide part, a first basic baffle, a blocking part, a locking plate, a push plate, a first telescopic driving rod and a material receiving part. When the push plate retracts to drive part of the materials of the tested sliding body and the basic sliding layer to fall into the upper side of the locking plate, the materials of the tested sliding body and the basic sliding layer fall into the material receiving box through the material falling hole, the material receiving box is pulled out from the side face of the simulation landslide groove, the first positioning rod leaves the second positioning hole, meanwhile, the second positioning rod leaves the first positioning hole, and the material receiving box is taken down; the cleaning process is simple, the situation that the tested sliding body material and the basic sliding layer material are accumulated at the top end of the simulated landslide groove is reduced, and after cleaning is completed, installation is conducted according to the opposite sequence.
本申请实施例提供隧道洞口滑坡启程机理试验装置,涉及滑坡启程机理领域。隧道洞口滑坡启程机理试验装置包括:基座组件、集料盒组件和滑坡组件。所述滑坡组件包括模拟滑坡件、第一基础挡板、拦阻件、锁固板、推板、第一伸缩驱动杆和收料件。当推板因收回带动部分被测滑体和基础滑层的材料落入锁固板上侧时,被测滑体和基础滑层的材料通过落料孔落入收料盒内,将收料盒从模拟滑坡槽侧面抽出,第一定位杆离开第二定位孔,同时,第二定位杆离开第一定位孔,取下收料盒,倒出收料盒内的废料,清理过程简单,减少被测滑体材料和基础滑层材料积累于模拟滑坡槽顶端的情况,清理完成后,再按相反的顺序进行安装。
Tunnel portal landslide starting mechanism test device
The embodiment of the invention provides a tunnel portal landslide starting mechanism testing device, and relates to the field of landslide starting mechanisms. The tunnel portal landslide starting mechanism test device comprises a base assembly, a material collection box assembly and a landslide assembly. The landslide assembly comprises a simulated landslide part, a first basic baffle, a blocking part, a locking plate, a push plate, a first telescopic driving rod and a material receiving part. When the push plate retracts to drive part of the materials of the tested sliding body and the basic sliding layer to fall into the upper side of the locking plate, the materials of the tested sliding body and the basic sliding layer fall into the material receiving box through the material falling hole, the material receiving box is pulled out from the side face of the simulation landslide groove, the first positioning rod leaves the second positioning hole, meanwhile, the second positioning rod leaves the first positioning hole, and the material receiving box is taken down; the cleaning process is simple, the situation that the tested sliding body material and the basic sliding layer material are accumulated at the top end of the simulated landslide groove is reduced, and after cleaning is completed, installation is conducted according to the opposite sequence.
本申请实施例提供隧道洞口滑坡启程机理试验装置,涉及滑坡启程机理领域。隧道洞口滑坡启程机理试验装置包括:基座组件、集料盒组件和滑坡组件。所述滑坡组件包括模拟滑坡件、第一基础挡板、拦阻件、锁固板、推板、第一伸缩驱动杆和收料件。当推板因收回带动部分被测滑体和基础滑层的材料落入锁固板上侧时,被测滑体和基础滑层的材料通过落料孔落入收料盒内,将收料盒从模拟滑坡槽侧面抽出,第一定位杆离开第二定位孔,同时,第二定位杆离开第一定位孔,取下收料盒,倒出收料盒内的废料,清理过程简单,减少被测滑体材料和基础滑层材料积累于模拟滑坡槽顶端的情况,清理完成后,再按相反的顺序进行安装。
Tunnel portal landslide starting mechanism test device
隧道洞口滑坡启程机理试验装置
ZHU DONGPING (Autor:in) / LI YONGYI (Autor:in) / XIA ZHENRONG (Autor:in) / MIAO YONGWANG (Autor:in) / HU YUNPENG (Autor:in) / YANG XIAOCHUN (Autor:in) / CHEN CHUNRONG (Autor:in) / SHI XINHUA (Autor:in) / TONG JIAXIU (Autor:in)
26.03.2024
Patent
Elektronische Ressource
Chinesisch
Protection equipment for preventing landslide of tunnel portal
Europäisches Patentamt | 2021
|Tunnel portal landslide disease treatment method based on tunnel structure sliding resistance
Europäisches Patentamt | 2024
|Recovery Execution in Landslide at the Portal of Highway Tunnel
Trans Tech Publications | 2011
|