Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Ultra-shallow-buried underground excavation heating pipeline structure of overpass subway station under construction and construction method of ultra-shallow-buried underground excavation heating pipeline structure
The invention discloses an ultra-shallow-buried underground excavation heating pipeline structure crossing a subway station under construction and a construction method of the ultra-shallow-buried underground excavation heating pipeline structure. Comprising an underground subway station under construction and a current heat source pipeline, the current heat source pipeline is located over the subway station under construction and is parallel to the subway station under construction, an underground heat distribution pipeline to be constructed is arranged above the subway station under construction, and the heat distribution pipeline to be constructed is perpendicular to the current heat source pipeline. A reinforcing backfilling structure is arranged in a heating power pipeline to be built, a newly-built heating power pipeline located under the ground is arranged over the heating power pipeline to be built, the newly-built heating power pipeline crosses a subway station under construction, and the newly-built heating power pipeline extends to the position over a current heat source pipeline. The newly-built heat supply pipeline and the current heat source pipeline are communicated through an arranged pipeline communication channel; the technical problem that the comprehensive function of the thermal structure is achieved under the complex working conditions and on the premise that the subway engineering structure under construction is not affected is solved.
本发明公开了一种上跨在建地铁站的超浅埋暗挖热力管线结构及其施工方法。包括位于地面下的在建地铁车站和现况热源管线,现况热源管线位于在建地铁车站的正上方,现况热源管线和在建地铁车站相平行,在建地铁车站的上方设置有位于地面下的拟建热力管线,拟建热力管线与现况热源管线垂直,在拟建热力管线内设置有加固回填结构,在拟建热力管线的正上方设置有位于地面下的新建热力管线,新建热力管线上跨在建地铁车站,新建热力管线延伸至现况热源管线的正上方,在新建热力管线和现况热源管线之间通过设置的管线连通通道连通;解决了在复杂工况条件下和不影响在建地铁工程结构的前提下保证热力结构综合性功能实现的技术问题。
Ultra-shallow-buried underground excavation heating pipeline structure of overpass subway station under construction and construction method of ultra-shallow-buried underground excavation heating pipeline structure
The invention discloses an ultra-shallow-buried underground excavation heating pipeline structure crossing a subway station under construction and a construction method of the ultra-shallow-buried underground excavation heating pipeline structure. Comprising an underground subway station under construction and a current heat source pipeline, the current heat source pipeline is located over the subway station under construction and is parallel to the subway station under construction, an underground heat distribution pipeline to be constructed is arranged above the subway station under construction, and the heat distribution pipeline to be constructed is perpendicular to the current heat source pipeline. A reinforcing backfilling structure is arranged in a heating power pipeline to be built, a newly-built heating power pipeline located under the ground is arranged over the heating power pipeline to be built, the newly-built heating power pipeline crosses a subway station under construction, and the newly-built heating power pipeline extends to the position over a current heat source pipeline. The newly-built heat supply pipeline and the current heat source pipeline are communicated through an arranged pipeline communication channel; the technical problem that the comprehensive function of the thermal structure is achieved under the complex working conditions and on the premise that the subway engineering structure under construction is not affected is solved.
本发明公开了一种上跨在建地铁站的超浅埋暗挖热力管线结构及其施工方法。包括位于地面下的在建地铁车站和现况热源管线,现况热源管线位于在建地铁车站的正上方,现况热源管线和在建地铁车站相平行,在建地铁车站的上方设置有位于地面下的拟建热力管线,拟建热力管线与现况热源管线垂直,在拟建热力管线内设置有加固回填结构,在拟建热力管线的正上方设置有位于地面下的新建热力管线,新建热力管线上跨在建地铁车站,新建热力管线延伸至现况热源管线的正上方,在新建热力管线和现况热源管线之间通过设置的管线连通通道连通;解决了在复杂工况条件下和不影响在建地铁工程结构的前提下保证热力结构综合性功能实现的技术问题。
Ultra-shallow-buried underground excavation heating pipeline structure of overpass subway station under construction and construction method of ultra-shallow-buried underground excavation heating pipeline structure
上跨在建地铁站的超浅埋暗挖热力管线结构及其施工方法
MA BINGJIAN (Autor:in) / CHEN JIANYI (Autor:in) / WANG DEQIANG (Autor:in) / YANG BO (Autor:in) / WANG YUAN (Autor:in) / HE JIPAN (Autor:in) / DUAN SHENGJIE (Autor:in) / FAN JINBU (Autor:in) / HAN KUANCHENG (Autor:in) / QU YUAN (Autor:in)
26.03.2024
Patent
Elektronische Ressource
Chinesisch
Construction method of ultra-shallow-buried large-span underground excavation subway station
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Shallow-buried underground pipeline protection structure and construction method thereof
Europäisches Patentamt | 2023
|Hydraulic excavation around a pipeline buried under shallow water
Europäisches Patentamt | 2020
|Hydraulic Excavation Around a Pipeline Buried Under Shallow Water
Europäisches Patentamt | 2020
|