The invention discloses a construction method of a valley terrain step slope closing skewback foundation. The method comprises the following steps: S10, constructing a side slope upper platform: flattening the side slope upper platform; driving steel pipe piles; pouring a concrete foundation and a concrete expansion end; and reinforcing section steel and anchoring plates are installed. S20, a supporting truss is installed, and guardrails are installed; a slope is leveled; fixing the end part of the support truss. And S30, the riverway protection structure is installed. S40, the skewback foundation is excavated and slag is discharged, wherein slag discharging equipment is installed; carrying out excavation and deslagging operation; and removing the deslagging equipment. S50, skewback concrete is poured, and a chute is installed; and pouring the skewback foundation. By means of the supporting truss on the side slope, deslagging transportation and concrete pouring conveying operation on the steep side slope are achieved, and the problem that large machines and transportation channels cannot be arranged due to the fact that the construction site of the side slope bottom skewback foundation is narrow is solved.
本发明公开了沟谷地形台阶收坡拱座基础的施工方法。本发明包括如下步骤:S10、施工边坡上平台:平整边坡上平台;打设钢管桩;浇筑混凝土基础及混凝土扩大端;安装加强型钢及锚固板。S20、安装支撑桁架:安装护栏;平整边坡;固定支撑桁架端部。S30、安装河道防护结构。S40、开挖拱座基础并出渣:安装出渣设备;开挖及出渣作业;拆除出渣设备。S50、浇筑拱座混凝土:安装溜槽;浇筑拱座基础。本发明利用边坡上的支撑桁架,实现了在陡峭边坡上实施出渣运输与混凝土浇筑传送作业,解决了边坡底拱座基础施工场地狭窄导致大型机械与运输通道无法设置的难题。
Construction method of valley terrain step slope closing skewback foundation
The invention discloses a construction method of a valley terrain step slope closing skewback foundation. The method comprises the following steps: S10, constructing a side slope upper platform: flattening the side slope upper platform; driving steel pipe piles; pouring a concrete foundation and a concrete expansion end; and reinforcing section steel and anchoring plates are installed. S20, a supporting truss is installed, and guardrails are installed; a slope is leveled; fixing the end part of the support truss. And S30, the riverway protection structure is installed. S40, the skewback foundation is excavated and slag is discharged, wherein slag discharging equipment is installed; carrying out excavation and deslagging operation; and removing the deslagging equipment. S50, skewback concrete is poured, and a chute is installed; and pouring the skewback foundation. By means of the supporting truss on the side slope, deslagging transportation and concrete pouring conveying operation on the steep side slope are achieved, and the problem that large machines and transportation channels cannot be arranged due to the fact that the construction site of the side slope bottom skewback foundation is narrow is solved.
本发明公开了沟谷地形台阶收坡拱座基础的施工方法。本发明包括如下步骤:S10、施工边坡上平台:平整边坡上平台;打设钢管桩;浇筑混凝土基础及混凝土扩大端;安装加强型钢及锚固板。S20、安装支撑桁架:安装护栏;平整边坡;固定支撑桁架端部。S30、安装河道防护结构。S40、开挖拱座基础并出渣:安装出渣设备;开挖及出渣作业;拆除出渣设备。S50、浇筑拱座混凝土:安装溜槽;浇筑拱座基础。本发明利用边坡上的支撑桁架,实现了在陡峭边坡上实施出渣运输与混凝土浇筑传送作业,解决了边坡底拱座基础施工场地狭窄导致大型机械与运输通道无法设置的难题。
Construction method of valley terrain step slope closing skewback foundation
沟谷地形台阶收坡拱座基础的施工方法
LU XIAOFENG (Autor:in) / GUO LING (Autor:in) / HUANG ZONGAN (Autor:in) / LIAN BIN (Autor:in) / SUN SHANSHAN (Autor:in) / YUE YANG (Autor:in) / LI TENGFEI (Autor:in) / WU QIYUAN (Autor:in) / WU FAN (Autor:in) / ZHANG DAN (Autor:in)
29.03.2024
Patent
Elektronische Ressource
Chinesisch
Construction method for deep foundation pit excavation on steep slope terrain
Europäisches Patentamt | 2015
|Bridge foundation protection structure for abrupt slope terrain and construction method
Europäisches Patentamt | 2021
|Construction method for pile group foundation of bridge in abrupt slope terrain
Europäisches Patentamt | 2023
|Construction method of high fill roadbed under soft foundation of abrupt slope terrain
Europäisches Patentamt | 2024
|