Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of deeply-buried double-hole superposed corridor
The invention relates to a construction method of a deeply-buried double-hole superposition corridor, the double-hole superposition corridor comprises outer wrapped concrete, an upper glass reinforced plastic pipe and a lower glass reinforced plastic pipe, and the construction method of the deeply-buried double-hole superposition corridor comprises the steps that a foundation pit is dug; pouring a cushion layer; erecting a lower bracket; installing a steel structure; first-stage pouring; an n-shaped supporting frame and an upper support are erected; the upper glass steel pipe is installed; installing a steel structure; and the other part of the encased concrete is poured. According to the technical scheme, the high-quality deeply-buried double-hole stacking corridor can be formed, the construction process is simple, the construction progress is fast, and the construction quality is high.
本发明涉及一种深埋双孔叠加廊道施工方法,所述双孔叠加廊道包括外包混凝土、上玻璃钢管和下玻璃钢管,所述深埋双孔叠加廊道施工方法包括:挖基坑;浇筑垫层;支设下支架;安装钢结构;第一阶段浇筑;支设门字支撑架和支设上支架;安装所述上玻璃钢管;安装钢结构;浇注另一部分所述外包混凝土。本发明实施例的技术方案可形成高质量的深埋双孔叠加廊道,且施工工艺简单,施工进度快,施工质量高。
Construction method of deeply-buried double-hole superposed corridor
The invention relates to a construction method of a deeply-buried double-hole superposition corridor, the double-hole superposition corridor comprises outer wrapped concrete, an upper glass reinforced plastic pipe and a lower glass reinforced plastic pipe, and the construction method of the deeply-buried double-hole superposition corridor comprises the steps that a foundation pit is dug; pouring a cushion layer; erecting a lower bracket; installing a steel structure; first-stage pouring; an n-shaped supporting frame and an upper support are erected; the upper glass steel pipe is installed; installing a steel structure; and the other part of the encased concrete is poured. According to the technical scheme, the high-quality deeply-buried double-hole stacking corridor can be formed, the construction process is simple, the construction progress is fast, and the construction quality is high.
本发明涉及一种深埋双孔叠加廊道施工方法,所述双孔叠加廊道包括外包混凝土、上玻璃钢管和下玻璃钢管,所述深埋双孔叠加廊道施工方法包括:挖基坑;浇筑垫层;支设下支架;安装钢结构;第一阶段浇筑;支设门字支撑架和支设上支架;安装所述上玻璃钢管;安装钢结构;浇注另一部分所述外包混凝土。本发明实施例的技术方案可形成高质量的深埋双孔叠加廊道,且施工工艺简单,施工进度快,施工质量高。
Construction method of deeply-buried double-hole superposed corridor
一种深埋双孔叠加廊道施工方法
YANG ZINAN (Autor:in) / WANG DONG (Autor:in) / WEI DESHENG (Autor:in) / KIM HYUN-YONG (Autor:in) / LI GUANGYUAN (Autor:in) / ZHANG XIN (Autor:in) / ZHANG HUIKAI (Autor:in)
29.03.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of deep-buried large straight double-hole side-by-side corridor
Europäisches Patentamt | 2024
|Construction method of deeply-buried large-diameter single-hole gallery
Europäisches Patentamt | 2024
|Construction method for underwater deeply-buried structure
Europäisches Patentamt | 2020
|Construction method of deeply-buried water platform bored piles
Europäisches Patentamt | 2020
|