Waterproof construction method for post-cast strip water stop plate
The invention provides a post-cast strip water stop plate waterproof construction method which comprises the following steps: S1, welding a water stop plate, and cleaning a welding seam position; s2, water stop strips are arranged at the corner welding positions and the middle positions of the water stop plates; s3, reinforcing steel bars are bound on the upper side and the lower side of the post-cast strip, and the water stop plate is fixed; and S4, concrete on the two sides of the post-cast strip is poured. The water stop strip is additionally arranged at the water stop plate welding position and the middle position of the basement post-cast strip bottom plate, so that holes and gaps are blocked, and water is prevented from permeating towards the two sides of the water stop plate.
本发明提供一种后浇带止水板防水施工方法,包括如下步骤S1,对止水板进行焊接,对焊缝位置进行清理;步骤S2,在止水板的拐角焊接位置及中间位置设置止水条;步骤S3,在后浇带上下两侧绑扎钢筋,对止水板进行固定;步骤S4,浇筑后浇带两侧的混凝土。本发明在地下室后浇带底板的止水板焊接处及中间位置增设一道止水条,从而将孔隙和缝隙堵塞,防止水向止水板两侧渗透。
Waterproof construction method for post-cast strip water stop plate
The invention provides a post-cast strip water stop plate waterproof construction method which comprises the following steps: S1, welding a water stop plate, and cleaning a welding seam position; s2, water stop strips are arranged at the corner welding positions and the middle positions of the water stop plates; s3, reinforcing steel bars are bound on the upper side and the lower side of the post-cast strip, and the water stop plate is fixed; and S4, concrete on the two sides of the post-cast strip is poured. The water stop strip is additionally arranged at the water stop plate welding position and the middle position of the basement post-cast strip bottom plate, so that holes and gaps are blocked, and water is prevented from permeating towards the two sides of the water stop plate.
本发明提供一种后浇带止水板防水施工方法,包括如下步骤S1,对止水板进行焊接,对焊缝位置进行清理;步骤S2,在止水板的拐角焊接位置及中间位置设置止水条;步骤S3,在后浇带上下两侧绑扎钢筋,对止水板进行固定;步骤S4,浇筑后浇带两侧的混凝土。本发明在地下室后浇带底板的止水板焊接处及中间位置增设一道止水条,从而将孔隙和缝隙堵塞,防止水向止水板两侧渗透。
Waterproof construction method for post-cast strip water stop plate
一种后浇带止水板防水施工方法
HUANG TIANMING (Autor:in) / ZHU BO (Autor:in) / YIN ZHIHAO (Autor:in) / CHEN SHIWEI (Autor:in) / JIN YANCAI (Autor:in) / LONG QIAO (Autor:in)
29.03.2024
Patent
Elektronische Ressource
Chinesisch
Butyl steel plate water stop post-cast strip construction method
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2024
|Foundation bottom plate advanced water stop post-cast strip and construction method
Europäisches Patentamt | 2020
|Top plate post-cast strip waterproof structure and construction method thereof
Europäisches Patentamt | 2024
|Basement bottom plate post-cast strip waterproof structure and construction method
Europäisches Patentamt | 2024
|