Construction method based on concrete block engineering frame filler wall
The invention relates to the field of building wall construction, and particularly discloses a construction method based on a concrete block engineering frame infilled wall, which comprises the following steps: pouring a floor slab, pouring frame columns on two sides, mounting a transverse base plate and a vertical base plate, welding vertical tie bars, and mounting the transverse base plate and the vertical base plate; then the infilled wall and the constructional columns are built layer by layer, meanwhile, transverse tie bars are laid on each layer to be matched with the transverse grooves, then vertical tie bars and the transverse tie bars are welded, pouring is conducted on the pouring cavities to form a whole, and finally the infilled wall and the constructional columns are filled with flame-retardant flexible filling materials; the rigid base plate, the transverse base plate and the vertical base plate can be better connected with the frame column through the first anchoring rib and the second anchoring rib, so that the infilled wall can be protected, and the integrity of the infilled wall is improved; and through the rigid base plate, the vertical base plate and the flame-retardant flexible filling material, the overall vibration can be greatly reduced.
本发明涉及建筑墙体施工领域,具体公开了一种基于混凝土砌块工程框架填充墙的施工方法,先对楼板进行浇筑,然后浇筑两侧框架柱,接着对横向垫板和竖向垫板进行安装,接着将竖向拉结筋进行焊接,然后对填充墙和构造柱进行逐层砌筑,同时每层铺设横向拉结筋使其与横槽配合,再对竖向拉结筋与横向拉结筋进行焊接,并对浇筑腔进行浇筑,使之形成整体,最后填充阻燃柔性填充材料;本发明中通过第一锚固筋和第二锚固筋能够将刚性垫板、横向垫板和竖向垫板与框架柱更好的连接,从而能够对填充墙进行防护,提高填充墙的整体性;通过刚性垫板、竖向垫板和阻燃柔性填充材料能够大大减小整体的震动。
Construction method based on concrete block engineering frame filler wall
The invention relates to the field of building wall construction, and particularly discloses a construction method based on a concrete block engineering frame infilled wall, which comprises the following steps: pouring a floor slab, pouring frame columns on two sides, mounting a transverse base plate and a vertical base plate, welding vertical tie bars, and mounting the transverse base plate and the vertical base plate; then the infilled wall and the constructional columns are built layer by layer, meanwhile, transverse tie bars are laid on each layer to be matched with the transverse grooves, then vertical tie bars and the transverse tie bars are welded, pouring is conducted on the pouring cavities to form a whole, and finally the infilled wall and the constructional columns are filled with flame-retardant flexible filling materials; the rigid base plate, the transverse base plate and the vertical base plate can be better connected with the frame column through the first anchoring rib and the second anchoring rib, so that the infilled wall can be protected, and the integrity of the infilled wall is improved; and through the rigid base plate, the vertical base plate and the flame-retardant flexible filling material, the overall vibration can be greatly reduced.
本发明涉及建筑墙体施工领域,具体公开了一种基于混凝土砌块工程框架填充墙的施工方法,先对楼板进行浇筑,然后浇筑两侧框架柱,接着对横向垫板和竖向垫板进行安装,接着将竖向拉结筋进行焊接,然后对填充墙和构造柱进行逐层砌筑,同时每层铺设横向拉结筋使其与横槽配合,再对竖向拉结筋与横向拉结筋进行焊接,并对浇筑腔进行浇筑,使之形成整体,最后填充阻燃柔性填充材料;本发明中通过第一锚固筋和第二锚固筋能够将刚性垫板、横向垫板和竖向垫板与框架柱更好的连接,从而能够对填充墙进行防护,提高填充墙的整体性;通过刚性垫板、竖向垫板和阻燃柔性填充材料能够大大减小整体的震动。
Construction method based on concrete block engineering frame filler wall
一种基于混凝土砌块工程框架填充墙的施工方法
FENG JIAQIAN (Autor:in) / YUN KUN (Autor:in) / ZHU HAITAO (Autor:in) / CAI BEI (Autor:in) / XIE WENHAO (Autor:in) / YOU WEIQIANG (Autor:in)
29.03.2024
Patent
Elektronische Ressource
Chinesisch
Construction technology of EPS module concrete frame filler wall
Europäisches Patentamt | 2022
|Fabricated frame with embedded filler wall and construction method
Europäisches Patentamt | 2020
|Fabricated concrete grating composite filler wall of frame structure
Europäisches Patentamt | 2024