Existing line steel cover beam structure and hoisting construction method
The invention provides an existing line steel cover beam structure and a hoisting construction method, and relates to the technical field of hoisting construction. The existing line steel cover beam structure comprises a pier column, a steel cover beam and a bearing assembly, the steel cover beam comprises a cover beam base section and an inserting block, and the cover beam base section is connected with the inserting block; the bearing assembly comprises a bearing table, the bearing table is arranged at the top end of the pier column, an inserting groove is formed in the bearing table, the side wall of the inserting groove is arranged to be a guide inclined face, and the inserting block is matched with the inserting groove in an inserting mode. The pier column is provided with connecting steel bars, the connecting steel bars penetrate out of the bearing table, inserting holes are formed in the inserting blocks, and the connecting steel bars are matched with the inserting holes in an inserting mode. A grouting hole is formed in the cover beam base section and communicates with the inserting hole. The cover beam base section and the bearing table are both provided with positioning guide plates, and the positioning guide plate located on the cover beam base section and the positioning guide plate located on the bearing table are coplanar. The steel cover beam and the pier column can be conveniently positioned and spliced.
本申请提供既有线钢盖梁结构及吊装施工方法,涉及吊装施工的技术领域。既有线钢盖梁结构包括:墩柱、钢盖梁和承接组件,钢盖梁包括盖梁基段和插接块,盖梁基段和插接块连接;承接组件包括承接台,承接台设置于墩柱的顶端,承接台开设有插接槽,插接槽侧壁设置为导向斜面,插接块与插接槽插接配合。墩柱设置有连接钢筋,连接钢筋从承接台穿出,插接块开设有插接孔,连接钢筋与插接孔插接配合;盖梁基段开设有灌浆孔,灌浆孔与插接孔连通。盖梁基段与承接台均设置有定位导向板,位于盖梁基段的定位导向板与位于承接台的定位导向板共面。本申请能够便于钢盖梁与墩柱进行定位和拼接。
Existing line steel cover beam structure and hoisting construction method
The invention provides an existing line steel cover beam structure and a hoisting construction method, and relates to the technical field of hoisting construction. The existing line steel cover beam structure comprises a pier column, a steel cover beam and a bearing assembly, the steel cover beam comprises a cover beam base section and an inserting block, and the cover beam base section is connected with the inserting block; the bearing assembly comprises a bearing table, the bearing table is arranged at the top end of the pier column, an inserting groove is formed in the bearing table, the side wall of the inserting groove is arranged to be a guide inclined face, and the inserting block is matched with the inserting groove in an inserting mode. The pier column is provided with connecting steel bars, the connecting steel bars penetrate out of the bearing table, inserting holes are formed in the inserting blocks, and the connecting steel bars are matched with the inserting holes in an inserting mode. A grouting hole is formed in the cover beam base section and communicates with the inserting hole. The cover beam base section and the bearing table are both provided with positioning guide plates, and the positioning guide plate located on the cover beam base section and the positioning guide plate located on the bearing table are coplanar. The steel cover beam and the pier column can be conveniently positioned and spliced.
本申请提供既有线钢盖梁结构及吊装施工方法,涉及吊装施工的技术领域。既有线钢盖梁结构包括:墩柱、钢盖梁和承接组件,钢盖梁包括盖梁基段和插接块,盖梁基段和插接块连接;承接组件包括承接台,承接台设置于墩柱的顶端,承接台开设有插接槽,插接槽侧壁设置为导向斜面,插接块与插接槽插接配合。墩柱设置有连接钢筋,连接钢筋从承接台穿出,插接块开设有插接孔,连接钢筋与插接孔插接配合;盖梁基段开设有灌浆孔,灌浆孔与插接孔连通。盖梁基段与承接台均设置有定位导向板,位于盖梁基段的定位导向板与位于承接台的定位导向板共面。本申请能够便于钢盖梁与墩柱进行定位和拼接。
Existing line steel cover beam structure and hoisting construction method
既有线钢盖梁结构及吊装施工方法
XU GUOCHANG (Autor:in) / NI SHUNTIAN (Autor:in) / SHU EN (Autor:in) / HUANG BINGLIN (Autor:in) / HANAYAMA HIROSHI (Autor:in) / CHEN LINGZHI (Autor:in) / ZHOU SHIJIE (Autor:in) / LIU MENGXING (Autor:in)
02.04.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Cover beam hoisting construction method and auxiliary cover beam hoisting device
Europäisches Patentamt | 2023
|Hoisting construction method for lower steel pier of existing bridge
Europäisches Patentamt | 2022
|Steel beam hoisting device for steel structure site construction
Europäisches Patentamt | 2024
|