Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge anti-collision wall embedded part suspension fixing device
The invention relates to a bridge anti-collision wall embedded part suspension fixing device which comprises a supporting frame of a U-shaped structure and comprises a transverse rod and vertical rods perpendicularly connected to the two ends of the transverse rod. The two device fixing rods are symmetrically arranged on the two vertical rods correspondingly and are in threaded connection with the ends, away from the transverse rod, of the vertical rods, and the two device fixing rods are used for being clamped and fixed to the two opposite sides of the upper end of the bridge anti-collision wall steel formwork; and the two embedded part fixing rods are symmetrically arranged on the two vertical rods correspondingly and are in threaded connection with the middles of the vertical rods, and the two embedded part fixing rods are used for clamping and fixing embedded parts. The supporting frame can be fixed to the bridge anti-collision beam steel formwork through the two device fixing rods, then the embedded part is suspended, clamped and fixed through the two embedded part fixing rods, and therefore the situation that the embedded part deviates in the concrete pouring process of the bridge anti-collision beam can be avoided, and the installation position precision of the embedded part is improved.
本发明涉及一种桥梁防撞墙预埋件悬置固定装置,其包括:支撑架,所述支撑架呈U型结构,包括横杆以及垂直连接于横杆两端的竖杆;两个装置固定杆,其分别对称设置于两个所述竖杆上,且螺纹连接于所述竖杆远离所述横杆的一端,两个所述装置固定杆用于夹持固定在桥梁防撞墙钢模板上端的相对两侧;两个预埋件固定杆,其分别对称设置于两个所述竖杆上,且螺纹连接于所述竖杆的中部,两个所述预埋件固定杆用于夹持固定预埋件。本发明可通过两个装置固定杆将支撑架固定在桥梁防撞梁钢模板上,再通过两个预埋件固定杆对预埋件进行悬置夹持固定,从而能够避免桥梁防撞梁的混凝土浇筑过程中预埋件发生偏移,提高了预埋件安装的位置精度。
Bridge anti-collision wall embedded part suspension fixing device
The invention relates to a bridge anti-collision wall embedded part suspension fixing device which comprises a supporting frame of a U-shaped structure and comprises a transverse rod and vertical rods perpendicularly connected to the two ends of the transverse rod. The two device fixing rods are symmetrically arranged on the two vertical rods correspondingly and are in threaded connection with the ends, away from the transverse rod, of the vertical rods, and the two device fixing rods are used for being clamped and fixed to the two opposite sides of the upper end of the bridge anti-collision wall steel formwork; and the two embedded part fixing rods are symmetrically arranged on the two vertical rods correspondingly and are in threaded connection with the middles of the vertical rods, and the two embedded part fixing rods are used for clamping and fixing embedded parts. The supporting frame can be fixed to the bridge anti-collision beam steel formwork through the two device fixing rods, then the embedded part is suspended, clamped and fixed through the two embedded part fixing rods, and therefore the situation that the embedded part deviates in the concrete pouring process of the bridge anti-collision beam can be avoided, and the installation position precision of the embedded part is improved.
本发明涉及一种桥梁防撞墙预埋件悬置固定装置,其包括:支撑架,所述支撑架呈U型结构,包括横杆以及垂直连接于横杆两端的竖杆;两个装置固定杆,其分别对称设置于两个所述竖杆上,且螺纹连接于所述竖杆远离所述横杆的一端,两个所述装置固定杆用于夹持固定在桥梁防撞墙钢模板上端的相对两侧;两个预埋件固定杆,其分别对称设置于两个所述竖杆上,且螺纹连接于所述竖杆的中部,两个所述预埋件固定杆用于夹持固定预埋件。本发明可通过两个装置固定杆将支撑架固定在桥梁防撞梁钢模板上,再通过两个预埋件固定杆对预埋件进行悬置夹持固定,从而能够避免桥梁防撞梁的混凝土浇筑过程中预埋件发生偏移,提高了预埋件安装的位置精度。
Bridge anti-collision wall embedded part suspension fixing device
桥梁防撞墙预埋件悬置固定装置
GUO QIANG (Autor:in) / ZHANG PENGFEI (Autor:in) / YANG DAWEI (Autor:in) / XIANG BO (Autor:in) / XU DONGSHENG (Autor:in) / HAO DONG (Autor:in) / BAI XUETAO (Autor:in)
02.04.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Self-fixing type bridge anti-collision wall formwork device and mounting method thereof
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Bridge anti-collision wall steel mould mounting device
Europäisches Patentamt | 2022
|