Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building outer wall fireproof isolation plate construction equipment and machine construction method
The invention provides building outer wall fireproof isolation plate construction equipment and a construction method, the building outer wall fireproof isolation plate construction equipment comprises a support, a lifting mechanism, a plate conveying mechanism, a pushing mechanism and a material distribution mechanism, the plate conveying mechanism is used for conveying a plurality of parallel fireproof isolation plates forwards, and a material storage and supply mechanism is used for providing paint for the material distribution mechanism; the material distributing mechanism transfers the first fireproof isolation plate on the headmost layer to the lower layer and conducts roller brushing on the inner surface of the first fireproof isolation plate, and the pushing mechanism is used for pushing the first fireproof isolation plate forwards and pressing the first fireproof isolation plate to the wall face. All the mechanisms cooperate together to effectively complete treatment and installation of the fireproof isolation plate, the efficient and controllable treatment and installation process of the fireproof isolation plate is achieved, the installation efficiency is improved, the working quality of the fireproof isolation plate is guaranteed, the labor intensity is reduced, the construction effect and the installation quality are improved, and the construction cost is reduced. The environment-friendly requirement is met, and good practical value and prospect are achieved.
本发明提供一种建筑外墙防火隔离板施工设备机器施工方法,包括支架、提升机构、送板机构、顶推机构和布料机构,送板机构用于将并列的多个防火隔离板向前输送,储料供料机构用于向布料机构提供涂料,布料机构将最前面的第一个防火隔离板向下层转移,并对第一个防火隔离板内表面辊刷涂料,所述顶推机构用于将第一个防护隔离板向前推送并压贴于墙面。本发明中各机构共同协作能够有效地完成对防火隔离板的处理和安装,实现了高效、可控的防火隔离板的处理与安装过程,不仅提高了安装效率,保证了防火隔离板工作的质量,也减少了劳动强度,提高了施工效果和安装质量,节约涂料用量满足环保需求,具有良好的实用价值和前景。
Building outer wall fireproof isolation plate construction equipment and machine construction method
The invention provides building outer wall fireproof isolation plate construction equipment and a construction method, the building outer wall fireproof isolation plate construction equipment comprises a support, a lifting mechanism, a plate conveying mechanism, a pushing mechanism and a material distribution mechanism, the plate conveying mechanism is used for conveying a plurality of parallel fireproof isolation plates forwards, and a material storage and supply mechanism is used for providing paint for the material distribution mechanism; the material distributing mechanism transfers the first fireproof isolation plate on the headmost layer to the lower layer and conducts roller brushing on the inner surface of the first fireproof isolation plate, and the pushing mechanism is used for pushing the first fireproof isolation plate forwards and pressing the first fireproof isolation plate to the wall face. All the mechanisms cooperate together to effectively complete treatment and installation of the fireproof isolation plate, the efficient and controllable treatment and installation process of the fireproof isolation plate is achieved, the installation efficiency is improved, the working quality of the fireproof isolation plate is guaranteed, the labor intensity is reduced, the construction effect and the installation quality are improved, and the construction cost is reduced. The environment-friendly requirement is met, and good practical value and prospect are achieved.
本发明提供一种建筑外墙防火隔离板施工设备机器施工方法,包括支架、提升机构、送板机构、顶推机构和布料机构,送板机构用于将并列的多个防火隔离板向前输送,储料供料机构用于向布料机构提供涂料,布料机构将最前面的第一个防火隔离板向下层转移,并对第一个防火隔离板内表面辊刷涂料,所述顶推机构用于将第一个防护隔离板向前推送并压贴于墙面。本发明中各机构共同协作能够有效地完成对防火隔离板的处理和安装,实现了高效、可控的防火隔离板的处理与安装过程,不仅提高了安装效率,保证了防火隔离板工作的质量,也减少了劳动强度,提高了施工效果和安装质量,节约涂料用量满足环保需求,具有良好的实用价值和前景。
Building outer wall fireproof isolation plate construction equipment and machine construction method
一种建筑外墙防火隔离板施工设备机器施工方法
ZHENG XIANGHUI (Autor:in) / CAI JUNFENG (Autor:in) / SHI LUJUN (Autor:in) / FENG HAOLIANG (Autor:in) / LI MINGWEI (Autor:in) / WU CHUANPENG (Autor:in) / HUANGFU JINGJING (Autor:in) / SHI QIUYUE (Autor:in) / ZHANG ZHENHUA (Autor:in) / GAO XIANG (Autor:in)
02.04.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Building outer wall fireproof isolation plate and building construction method thereof
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2020
|Novel fabricated building fireproof outer wall and construction method thereof
Europäisches Patentamt | 2024
|Super high-rise building outer wall fireproof system and construction method
Europäisches Patentamt | 2024
|Building outer wall fireproof thermal insulation system and construction method thereof
Europäisches Patentamt | 2024
|