Creeping formwork construction method for bent cap
The invention discloses a cover beam creeping formwork construction method which comprises the following steps that a cover beam construction creeping formwork device is installed at the bottom of a pier column, the cover beam construction creeping formwork device comprises at least two sets of creeping formwork mechanisms and a cover beam formwork, and each set of creeping formwork mechanisms comprises a first hoop, a second hoop and a jacking piece; the first hoop is arranged above the second hoop, and the telescopic jacking piece is connected between the first hoop and the second hoop; the bent cap template is detachably and fixedly connected to the upper surface of the first hoop; and the formwork climbing mechanism is started, and the first hoop and the second hoop hold the pier column tightly and ascend alternately till the bent cap formwork walks to the designed position. By the adoption of the method, the workload of aloft work in capping beam construction can be further reduced, and the aloft work risk is reduced.
本发明公开了一种盖梁的爬模施工方法,包括以下步骤:在墩柱底部安装盖梁施工爬模装置,所述盖梁施工爬模装置包括爬模机构和盖梁模板,所述爬模机构至少设置有两组,每组均包括第一抱箍、第二抱箍和顶升件,所述第一抱箍设置在所述第二抱箍的上方,所述第一抱箍和所述第二抱箍之间连接有可伸缩的所述顶升件;所述盖梁模板可拆卸地固定连接在所述第一抱箍的上面;启动爬模机构,所述第一抱箍和所述第二抱箍抱紧墩柱交替上升,直至盖梁模板走行到设计位置。采用本发明的方法能更进一步降低盖梁施工中高空作业的工作量,降低高空作业风险。
Creeping formwork construction method for bent cap
The invention discloses a cover beam creeping formwork construction method which comprises the following steps that a cover beam construction creeping formwork device is installed at the bottom of a pier column, the cover beam construction creeping formwork device comprises at least two sets of creeping formwork mechanisms and a cover beam formwork, and each set of creeping formwork mechanisms comprises a first hoop, a second hoop and a jacking piece; the first hoop is arranged above the second hoop, and the telescopic jacking piece is connected between the first hoop and the second hoop; the bent cap template is detachably and fixedly connected to the upper surface of the first hoop; and the formwork climbing mechanism is started, and the first hoop and the second hoop hold the pier column tightly and ascend alternately till the bent cap formwork walks to the designed position. By the adoption of the method, the workload of aloft work in capping beam construction can be further reduced, and the aloft work risk is reduced.
本发明公开了一种盖梁的爬模施工方法,包括以下步骤:在墩柱底部安装盖梁施工爬模装置,所述盖梁施工爬模装置包括爬模机构和盖梁模板,所述爬模机构至少设置有两组,每组均包括第一抱箍、第二抱箍和顶升件,所述第一抱箍设置在所述第二抱箍的上方,所述第一抱箍和所述第二抱箍之间连接有可伸缩的所述顶升件;所述盖梁模板可拆卸地固定连接在所述第一抱箍的上面;启动爬模机构,所述第一抱箍和所述第二抱箍抱紧墩柱交替上升,直至盖梁模板走行到设计位置。采用本发明的方法能更进一步降低盖梁施工中高空作业的工作量,降低高空作业风险。
Creeping formwork construction method for bent cap
一种盖梁的爬模施工方法
LENG YAN (Autor:in) / SHA MING (Autor:in) / LI SHENG (Autor:in) / SU JUN (Autor:in) / SUN QIKE (Autor:in) / ZHANG BOCONG (Autor:in) / ZHANG XIANGYUAN (Autor:in) / ZHU SHULAN (Autor:in) / TAN BENQI (Autor:in) / WEI YI (Autor:in)
09.04.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Automatic creeping formwork mechanism for cable bent tower and construction method
Europäisches Patentamt | 2024
|Solar cell creeping formwork guardrail and creeping formwork
Europäisches Patentamt | 2023
|Novel hydraulic creeping formwork construction method
Europäisches Patentamt | 2021
|Creeping formwork structure and construction method thereof
Europäisches Patentamt | 2021
|Construction method of formwork system for highly-deviated tower construction creeping formwork
Europäisches Patentamt | 2021
|