Constructional column with concrete flush top plate and construction method of constructional column
The constructional column comprises a constructional column body arranged between an upper-layer floor slab and a lower-layer floor slab, the constructional column body is provided with a reinforcement cage, the bottom of the upper-layer floor slab and the bottom of the lower-layer floor slab are provided with top grooves used for being connected with the constructional column body, and the bottom of the upper-layer floor slab and the bottom of the lower-layer floor slab are provided with bottom grooves used for being connected with the constructional column body. Bottom grooves used for being connected with the bottom of the constructional column body are formed in the tops of the upper-layer floor and the lower-layer floor. The invention discloses a construction method of a constructional column with concrete flush with a top plate. The construction method comprises the following steps: step 1, pouring a floor slab of a building; 2, vertical ribs are hung on the fixing ribs; 3, fixedly connecting the dismounting rib and the fixing rib; step 4, mounting a hoop; 5, a wall body is manufactured; 6, a limiting pipe and a guide pipe are installed; 7, building a template; 8, pouring the constructional column body; and step 9, removing the mold. The construction method has the effect of improving the integrality that the concrete of the constructional column and the concrete of the floor slab are solidified into a whole.
本发明公开了一种混凝土平齐顶板的构造柱及其施工方法,一种混凝土平齐顶板的构造柱.包括设置于上层楼板和下层楼板之间的构造柱本体,构造柱本体设置有钢筋笼,上层楼板和下层楼板的底部设置有用于连接构造柱本体的顶部槽,上层楼板和下层楼板的顶部设置有用于连接构造柱本体底部的底部槽。一种混凝土平齐顶板的构造柱的施工方法,包括以下步骤:步骤1:浇筑建筑的楼板;步骤2:向固定筋挂竖筋;步骤3:将拆装筋和固定筋固定连接;步骤4:安装抱箍;步骤5:制成墙体;步骤6:安装限制管和导管;步骤7:搭模板;步骤8:浇筑构造柱本体;步骤9:拆模。本申请具有提高构造柱的混凝土与楼板的混凝土凝固成一体的整体性的效果。
Constructional column with concrete flush top plate and construction method of constructional column
The constructional column comprises a constructional column body arranged between an upper-layer floor slab and a lower-layer floor slab, the constructional column body is provided with a reinforcement cage, the bottom of the upper-layer floor slab and the bottom of the lower-layer floor slab are provided with top grooves used for being connected with the constructional column body, and the bottom of the upper-layer floor slab and the bottom of the lower-layer floor slab are provided with bottom grooves used for being connected with the constructional column body. Bottom grooves used for being connected with the bottom of the constructional column body are formed in the tops of the upper-layer floor and the lower-layer floor. The invention discloses a construction method of a constructional column with concrete flush with a top plate. The construction method comprises the following steps: step 1, pouring a floor slab of a building; 2, vertical ribs are hung on the fixing ribs; 3, fixedly connecting the dismounting rib and the fixing rib; step 4, mounting a hoop; 5, a wall body is manufactured; 6, a limiting pipe and a guide pipe are installed; 7, building a template; 8, pouring the constructional column body; and step 9, removing the mold. The construction method has the effect of improving the integrality that the concrete of the constructional column and the concrete of the floor slab are solidified into a whole.
本发明公开了一种混凝土平齐顶板的构造柱及其施工方法,一种混凝土平齐顶板的构造柱.包括设置于上层楼板和下层楼板之间的构造柱本体,构造柱本体设置有钢筋笼,上层楼板和下层楼板的底部设置有用于连接构造柱本体的顶部槽,上层楼板和下层楼板的顶部设置有用于连接构造柱本体底部的底部槽。一种混凝土平齐顶板的构造柱的施工方法,包括以下步骤:步骤1:浇筑建筑的楼板;步骤2:向固定筋挂竖筋;步骤3:将拆装筋和固定筋固定连接;步骤4:安装抱箍;步骤5:制成墙体;步骤6:安装限制管和导管;步骤7:搭模板;步骤8:浇筑构造柱本体;步骤9:拆模。本申请具有提高构造柱的混凝土与楼板的混凝土凝固成一体的整体性的效果。
Constructional column with concrete flush top plate and construction method of constructional column
一种混凝土平齐顶板的构造柱及其施工方法
HUANG ZHIFENG (Autor:in) / WU WEIJIAN (Autor:in) / ZHENG WEIXIN (Autor:in)
09.04.2024
Patent
Elektronische Ressource
Chinesisch
Constructional column construction method for concrete flush top plate
Europäisches Patentamt | 2023
|Constructional column construction method and constructional column mold
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2021
|Constructional column concrete pouring robot and constructional column pouring method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|