Construction method for reducing soil loss of planted sloping roof
The invention discloses a construction method for reducing soil loss of a planting sloping roof, and belongs to the technical field of planting sloping roof construction. Firstly, a cast-in-place roof is divided into cells; the cell size is predicted to be less than 1m * 1m; 2, formwork erecting is conducted on the cast-in-place roof according to the cell division lines, and drainage holes are reserved in advance during formwork erecting; and 3, finally, cast-in-place component pouring is conducted, and after pouring is completed, the next step of construction can be conducted when the strength of the cast-in-place component meets the requirement. The technical problems that roof planting soil can slip in a large area due to natural disasters such as gravity or heavy rain, and water in the soil can be lost due to gravity are solved.
本发明公开了一种减少种植斜屋面泥土流失的施工方法,属于种植斜屋面施工技术领域。首先在现浇屋面划分单元格;预计单元格大小小于1m*1m;步骤2、然后根据单元格划分线在现浇屋面进行支模,支模时提前预留排水孔;步骤3、最后进行现浇构件浇筑,浇筑完成后等现浇构件的强度达到要求即可进行下一步施工。本发明解决了屋面种植土会因重力或大雨等自然灾害发生大面积滑移,土中的水也会因重力流失的技术问题。
Construction method for reducing soil loss of planted sloping roof
The invention discloses a construction method for reducing soil loss of a planting sloping roof, and belongs to the technical field of planting sloping roof construction. Firstly, a cast-in-place roof is divided into cells; the cell size is predicted to be less than 1m * 1m; 2, formwork erecting is conducted on the cast-in-place roof according to the cell division lines, and drainage holes are reserved in advance during formwork erecting; and 3, finally, cast-in-place component pouring is conducted, and after pouring is completed, the next step of construction can be conducted when the strength of the cast-in-place component meets the requirement. The technical problems that roof planting soil can slip in a large area due to natural disasters such as gravity or heavy rain, and water in the soil can be lost due to gravity are solved.
本发明公开了一种减少种植斜屋面泥土流失的施工方法,属于种植斜屋面施工技术领域。首先在现浇屋面划分单元格;预计单元格大小小于1m*1m;步骤2、然后根据单元格划分线在现浇屋面进行支模,支模时提前预留排水孔;步骤3、最后进行现浇构件浇筑,浇筑完成后等现浇构件的强度达到要求即可进行下一步施工。本发明解决了屋面种植土会因重力或大雨等自然灾害发生大面积滑移,土中的水也会因重力流失的技术问题。
Construction method for reducing soil loss of planted sloping roof
一种减少种植斜屋面泥土流失的施工方法
LI QIANGQIANG (Autor:in) / GAO CHENG (Autor:in) / ZHAO DONGDONG (Autor:in)
09.04.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
Formwork structure for sloping roof and sloping roof construction method