New energy aluminum foil workshop clean area arrangement structure
According to the arrangement structure of the clean area of the new energy aluminum foil plant, the new energy aluminum foil plant comprises an auxiliary span, a rolling area, a slitting area, a finished product storage area, a slitting waste packaging area, a fine cutting packaging area and a fine cutting waste packaging area, the fine cutting packaging area is a clean area, and the other areas are non-clean areas; the auxiliary span, the rolling area, the slitting area, the finished product storage area and the slitting waste packaging area are arranged in one steel structure factory building, the fine cutting packaging area and the fine cutting waste packaging area are arranged in the other concrete structure factory building, and the steel structure factory building and the concrete structure factory building are arranged adjacently; according to the new energy aluminum foil workshop clean area arrangement structure, all clean areas and part of non-clean areas are actually stripped from an original steel structure workshop; therefore, the problems that the column distance of a concrete frame structure is inconsistent with the column distance of a main workshop steel structure, a cold and hot medium pipeline is too long and complex in design, and the overall operation management difficulty and cost of a workshop are high are solved.
一种新能源铝箔厂房洁净区布置结构,所述新能源铝箔厂房包括辅跨、轧制区、分切区、成品存储区、分切废料打包区、精切包装区、精切废料打包区,其中精切包装区为洁净区,其余区域为非洁净区;辅跨、轧制区、分切区、成品存储区、分切废料打包区设置在一个钢结构厂房内,精切包装区、精切废料打包区设置在另一个混凝土结构厂房内,钢结构厂房与混凝土结构厂房相邻设置;上述新能源铝箔厂房洁净区布置结构,实际将所有洁净区及部分非洁净区从原有钢结构厂房中剥离出去,从而解决了混凝土框架结构柱距与主厂房钢构柱距不一致、冷热媒管道过长且设计复杂、厂房整体运行管理难度及成本高等诸多问题。
New energy aluminum foil workshop clean area arrangement structure
According to the arrangement structure of the clean area of the new energy aluminum foil plant, the new energy aluminum foil plant comprises an auxiliary span, a rolling area, a slitting area, a finished product storage area, a slitting waste packaging area, a fine cutting packaging area and a fine cutting waste packaging area, the fine cutting packaging area is a clean area, and the other areas are non-clean areas; the auxiliary span, the rolling area, the slitting area, the finished product storage area and the slitting waste packaging area are arranged in one steel structure factory building, the fine cutting packaging area and the fine cutting waste packaging area are arranged in the other concrete structure factory building, and the steel structure factory building and the concrete structure factory building are arranged adjacently; according to the new energy aluminum foil workshop clean area arrangement structure, all clean areas and part of non-clean areas are actually stripped from an original steel structure workshop; therefore, the problems that the column distance of a concrete frame structure is inconsistent with the column distance of a main workshop steel structure, a cold and hot medium pipeline is too long and complex in design, and the overall operation management difficulty and cost of a workshop are high are solved.
一种新能源铝箔厂房洁净区布置结构,所述新能源铝箔厂房包括辅跨、轧制区、分切区、成品存储区、分切废料打包区、精切包装区、精切废料打包区,其中精切包装区为洁净区,其余区域为非洁净区;辅跨、轧制区、分切区、成品存储区、分切废料打包区设置在一个钢结构厂房内,精切包装区、精切废料打包区设置在另一个混凝土结构厂房内,钢结构厂房与混凝土结构厂房相邻设置;上述新能源铝箔厂房洁净区布置结构,实际将所有洁净区及部分非洁净区从原有钢结构厂房中剥离出去,从而解决了混凝土框架结构柱距与主厂房钢构柱距不一致、冷热媒管道过长且设计复杂、厂房整体运行管理难度及成本高等诸多问题。
New energy aluminum foil workshop clean area arrangement structure
一种新能源铝箔厂房洁净区布置结构
LIU XIAOFEI (Autor:in) / ZHAO JINGSONG (Autor:in) / XIA ZHEN (Autor:in) / ZHOU CHENGQUN (Autor:in) / ZHANG CHENG (Autor:in) / FAN SHANGSHANG (Autor:in) / WANG XINYUE (Autor:in) / TONG YILIN (Autor:in)
09.04.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
/
E03C
DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER
,
Hausinstallationen für Frisch- oder Abwasser
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Construction method for anti-static clean ground of lithium battery copper foil workshop