Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Asphalt pavement construction method
The invention belongs to the technical field of asphalt pavement, and particularly relates to an asphalt pavement construction method which comprises the following specific operation steps: S1, screening raw materials, and synchronously detecting a pavement; s2, mixing the raw materials to meet the requirements, and loading; s3, pavement filler is manually dispersed; s4, carrying out secondary rolling on the filler; and S5, checking and filling. During laying, the baffles are embedded into the inner edges of the laying construction grooves, a certain space is reserved between the laying layer formed by laying the raw materials and the original laying layer through the baffles, during subsequent filling, the raw materials in the space can be independently flattened, the uneven condition is avoided, and during laying, filling and compacting are not directly conducted, so that the laying efficiency is improved. Stacked raw materials are manually controlled in advance, the amount of the raw materials is empirically judged after the raw materials are manually dispersed, and some raw materials are taken out when the raw materials are too many; when the raw materials are few, the raw materials can be added properly and can be supplemented after being compacted.
本发明属于沥青铺设技术领域,具体为一种沥青路面施工方法,该沥青路面施工方法的具体操作步骤如下:S1:原料筛选、同步检测路面;S2:原料混合达到要求并装机;S3:路面填料、人工分散;S4:填料二次碾压;S5:检验、填补。在铺设时,在铺设施工槽的内部边缘处嵌入挡板,挡板使得原料铺设形成的铺设层与原铺设层之间留有一定的空间,在后续填充时,单独对该空间内的原料压平即可,避免出现高低不平的情况,且在铺设时,并不是直接填料压实,通过人工预先将堆状的原料堆放控制,在人工分散原料后对原料量进行经验判断,当原料较多时,取出一些;原料较少时,可以适当增加一些,即使原料经过压实后续也可以补充。
Asphalt pavement construction method
The invention belongs to the technical field of asphalt pavement, and particularly relates to an asphalt pavement construction method which comprises the following specific operation steps: S1, screening raw materials, and synchronously detecting a pavement; s2, mixing the raw materials to meet the requirements, and loading; s3, pavement filler is manually dispersed; s4, carrying out secondary rolling on the filler; and S5, checking and filling. During laying, the baffles are embedded into the inner edges of the laying construction grooves, a certain space is reserved between the laying layer formed by laying the raw materials and the original laying layer through the baffles, during subsequent filling, the raw materials in the space can be independently flattened, the uneven condition is avoided, and during laying, filling and compacting are not directly conducted, so that the laying efficiency is improved. Stacked raw materials are manually controlled in advance, the amount of the raw materials is empirically judged after the raw materials are manually dispersed, and some raw materials are taken out when the raw materials are too many; when the raw materials are few, the raw materials can be added properly and can be supplemented after being compacted.
本发明属于沥青铺设技术领域,具体为一种沥青路面施工方法,该沥青路面施工方法的具体操作步骤如下:S1:原料筛选、同步检测路面;S2:原料混合达到要求并装机;S3:路面填料、人工分散;S4:填料二次碾压;S5:检验、填补。在铺设时,在铺设施工槽的内部边缘处嵌入挡板,挡板使得原料铺设形成的铺设层与原铺设层之间留有一定的空间,在后续填充时,单独对该空间内的原料压平即可,避免出现高低不平的情况,且在铺设时,并不是直接填料压实,通过人工预先将堆状的原料堆放控制,在人工分散原料后对原料量进行经验判断,当原料较多时,取出一些;原料较少时,可以适当增加一些,即使原料经过压实后续也可以补充。
Asphalt pavement construction method
一种沥青路面施工方法
LIANG XIAOYAO (Autor:in) / XU ZHIHUI (Autor:in) / LIN ZHIYUAN (Autor:in) / ZHOU YUEPING (Autor:in)
12.04.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE