Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
High-strength light building structural member
The invention relates to the technical field of buildings, and discloses a high-strength light building structural member which comprises a foundation, first supporting columns are fixedly mounted at the four corners of the upper surface of the foundation, two wallboard structures are arranged between the two first supporting columns, and a first supporting reinforcing device is arranged between the two wallboard structures; a second supporting and reinforcing device is arranged on the tops of the first supporting column, the wallboard structure and the first supporting and reinforcing device. According to the high-strength light building structural member, the second supporting and reinforcing device is designed on the high-strength light building structural member, when the high-strength light building structural member is used, connecting blocks and limiting blocks at the bottoms of upper reinforcing plates are inserted into mounting grooves formed in the tops of a building wallboard, a second supporting column and a first supporting column, and inserting blocks of different upper reinforcing plates are inserted into inserting grooves; and fixing is conducted through the locking bolts, so that the connecting strength of the first supporting column, the building wall plate and the second supporting column is improved, the assembling time is saved, and meanwhile the quality of the assembled type building is improved.
本发明涉及建筑技术领域,且公开了一种高强度轻质建筑结构构件,地基,地基上表面四角处固定安装有第一支撑柱,两组第一支撑柱之间设置有两组墙板结构,两组墙板结构之间设置有第一支撑加强装置,第一支撑柱、墙板结构和第一支撑加强装置顶部设置有第二支撑加强装置。本发明通过在一种高强度轻质建筑结构构件上设计第二支撑加强装置,使用时,将上加强板底部的连接块和限位块插入建筑墙板、第二支撑柱和第一支撑柱顶部所开设的安装槽中,且不同的上加强板的插块插入插槽内部,并通过锁紧螺栓进行固定,以提高第一支撑柱、建筑墙板和第二支撑柱的连接强度,节省组装时间的同时提高装配式建筑组装后的质量。
High-strength light building structural member
The invention relates to the technical field of buildings, and discloses a high-strength light building structural member which comprises a foundation, first supporting columns are fixedly mounted at the four corners of the upper surface of the foundation, two wallboard structures are arranged between the two first supporting columns, and a first supporting reinforcing device is arranged between the two wallboard structures; a second supporting and reinforcing device is arranged on the tops of the first supporting column, the wallboard structure and the first supporting and reinforcing device. According to the high-strength light building structural member, the second supporting and reinforcing device is designed on the high-strength light building structural member, when the high-strength light building structural member is used, connecting blocks and limiting blocks at the bottoms of upper reinforcing plates are inserted into mounting grooves formed in the tops of a building wallboard, a second supporting column and a first supporting column, and inserting blocks of different upper reinforcing plates are inserted into inserting grooves; and fixing is conducted through the locking bolts, so that the connecting strength of the first supporting column, the building wall plate and the second supporting column is improved, the assembling time is saved, and meanwhile the quality of the assembled type building is improved.
本发明涉及建筑技术领域,且公开了一种高强度轻质建筑结构构件,地基,地基上表面四角处固定安装有第一支撑柱,两组第一支撑柱之间设置有两组墙板结构,两组墙板结构之间设置有第一支撑加强装置,第一支撑柱、墙板结构和第一支撑加强装置顶部设置有第二支撑加强装置。本发明通过在一种高强度轻质建筑结构构件上设计第二支撑加强装置,使用时,将上加强板底部的连接块和限位块插入建筑墙板、第二支撑柱和第一支撑柱顶部所开设的安装槽中,且不同的上加强板的插块插入插槽内部,并通过锁紧螺栓进行固定,以提高第一支撑柱、建筑墙板和第二支撑柱的连接强度,节省组装时间的同时提高装配式建筑组装后的质量。
High-strength light building structural member
一种高强度轻质建筑结构构件
LIU JINGYUE (Autor:in)
12.04.2024
Patent
Elektronische Ressource
Chinesisch
HIGH-SPEED BUILDING CONSTRUCTION METHOD USINGB LIGHT CONCRETE AND STRENGTH MEMBER
Europäisches Patentamt | 2016
|Structural member for fabricated building and building structure with structural member
Europäisches Patentamt | 2022
|