Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Formwork column mounting construction structure and formwork column mounting construction method
The invention relates to a formwork column installation construction structure and a formwork column installation construction method.The formwork column installation construction structure comprises a formwork column, a temporary inclined strut and a mechanical connecting sleeve, a first hanging piece is arranged on the outer side wall of the formwork column, one end of the temporary inclined strut is connected with the first hanging piece in a matched and hung mode, and the other end of the temporary inclined strut is connected with the mechanical connecting sleeve in a matched and hung mode; the other end of the temporary inclined strut is used for being connected with a second hooking piece on floor slab pouring concrete. A vertically-arranged first column longitudinal bar extends out of the lower end of the formwork column, and a mechanical connecting sleeve used for being connected with a second column longitudinal bar on floor slab pouring concrete is arranged on the first column longitudinal bar in a matched and matched mode. According to the formwork column installation construction structure, a temporary inclined strut connecting mode is adopted, the mechanical connecting sleeve is matched, the formwork column construction time can be shortened, the perpendicularity, the elevation and the plane position of the formwork column meet the construction requirements after installation is completed, and the quality impression after overall installation is guaranteed.
本发明涉及一种模壳柱安装施工结构及模壳柱安装施工方法,模壳柱安装施工结构包括模壳柱、临时斜撑和机械连接套筒,所述模壳柱的外侧壁上设有第一挂接件,所述临时斜撑的一端与所述第一挂接件适配挂接,所述临时斜撑的另一端用于连接楼板浇筑混凝土上的第二挂接件;所述模壳柱的下端伸出有竖直布置的第一柱纵筋,所述第一柱纵筋上适配套设有用于连接楼板浇筑混凝土上第二柱纵筋的机械连接套筒。本发明的模壳柱安装施工结构,采用临时斜撑的连接方式,并配合机械连接套筒,能够缩短模壳柱施工时间,安装完成后模壳柱垂直度、标高、平面位置符合施工要求,保证整体安装后的质量观感。
Formwork column mounting construction structure and formwork column mounting construction method
The invention relates to a formwork column installation construction structure and a formwork column installation construction method.The formwork column installation construction structure comprises a formwork column, a temporary inclined strut and a mechanical connecting sleeve, a first hanging piece is arranged on the outer side wall of the formwork column, one end of the temporary inclined strut is connected with the first hanging piece in a matched and hung mode, and the other end of the temporary inclined strut is connected with the mechanical connecting sleeve in a matched and hung mode; the other end of the temporary inclined strut is used for being connected with a second hooking piece on floor slab pouring concrete. A vertically-arranged first column longitudinal bar extends out of the lower end of the formwork column, and a mechanical connecting sleeve used for being connected with a second column longitudinal bar on floor slab pouring concrete is arranged on the first column longitudinal bar in a matched and matched mode. According to the formwork column installation construction structure, a temporary inclined strut connecting mode is adopted, the mechanical connecting sleeve is matched, the formwork column construction time can be shortened, the perpendicularity, the elevation and the plane position of the formwork column meet the construction requirements after installation is completed, and the quality impression after overall installation is guaranteed.
本发明涉及一种模壳柱安装施工结构及模壳柱安装施工方法,模壳柱安装施工结构包括模壳柱、临时斜撑和机械连接套筒,所述模壳柱的外侧壁上设有第一挂接件,所述临时斜撑的一端与所述第一挂接件适配挂接,所述临时斜撑的另一端用于连接楼板浇筑混凝土上的第二挂接件;所述模壳柱的下端伸出有竖直布置的第一柱纵筋,所述第一柱纵筋上适配套设有用于连接楼板浇筑混凝土上第二柱纵筋的机械连接套筒。本发明的模壳柱安装施工结构,采用临时斜撑的连接方式,并配合机械连接套筒,能够缩短模壳柱施工时间,安装完成后模壳柱垂直度、标高、平面位置符合施工要求,保证整体安装后的质量观感。
Formwork column mounting construction structure and formwork column mounting construction method
一种模壳柱安装施工结构及模壳柱安装施工方法
ZHANG BO (Autor:in) / MU HONGWEI (Autor:in) / LONG CHUNLIN (Autor:in) / CUI YUANQING (Autor:in) / DING YOUYIN (Autor:in) / HU HUO (Autor:in) / LIU ZHEN (Autor:in) / WANG JIN (Autor:in) / LI GUOQIANG (Autor:in) / YANG QIAOGANG (Autor:in)
12.04.2024
Patent
Elektronische Ressource
Chinesisch
Wall column stair formwork mounting structure and construction method thereof
Europäisches Patentamt | 2022
|Square stand column formwork mounting structure and mounting method thereof
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|Formwork for fair-faced concrete, formwork mounting structure and construction method
Europäisches Patentamt | 2021
|