The invention discloses a construction technology of an attached lifting scaffold under the working condition of changeable structural outline and floor height, and relates to the technical field of building construction. To solve efficiency problems; the attached lifting scaffold is composed of a protective turning plate at the bottom and a plurality of splicing modules which are sequentially connected in the longitudinal direction, side protective nets are arranged on the side faces of the two ends of each splicing module, face protective nets are arranged on the outer side faces of the splicing modules, and the method comprises the steps of design and material selection, cross construction and hoisting combination. On the basis that modular design is adopted, splicing procedures of the modules can be carried out at the same time in a crossed mode, on one hand, the construction efficiency can be improved, the construction period can be shortened, on the other hand, the workload of high-altitude splicing operation can be greatly reduced, and therefore the construction safety is improved.
本发明公开了一种结构轮廓及层高多变工况下附着升降脚手架施工工艺,涉及建筑施工技术领域;为了解决效率问题;该结构轮廓及层高多变工况下附着升降脚手架由底部的防护翻板以及多组纵向依次连接的拼接模组组成,所述拼接模组的两端侧面设置有侧防护网,拼接模组的外侧面设置有面防护网,该方法包括设计与选材,交叉施工,吊装组合。本发明在采用模块化设计的基础上,模块的拼接工序可以交叉同时进行,一方面可增加施工效率,缩短工期,另一方面也能大幅度减少高空拼接作业的作业量,从而增加了施工的安全性。
Construction process of attached lifting scaffold under variable working conditions of structural outline and floor height
The invention discloses a construction technology of an attached lifting scaffold under the working condition of changeable structural outline and floor height, and relates to the technical field of building construction. To solve efficiency problems; the attached lifting scaffold is composed of a protective turning plate at the bottom and a plurality of splicing modules which are sequentially connected in the longitudinal direction, side protective nets are arranged on the side faces of the two ends of each splicing module, face protective nets are arranged on the outer side faces of the splicing modules, and the method comprises the steps of design and material selection, cross construction and hoisting combination. On the basis that modular design is adopted, splicing procedures of the modules can be carried out at the same time in a crossed mode, on one hand, the construction efficiency can be improved, the construction period can be shortened, on the other hand, the workload of high-altitude splicing operation can be greatly reduced, and therefore the construction safety is improved.
本发明公开了一种结构轮廓及层高多变工况下附着升降脚手架施工工艺,涉及建筑施工技术领域;为了解决效率问题;该结构轮廓及层高多变工况下附着升降脚手架由底部的防护翻板以及多组纵向依次连接的拼接模组组成,所述拼接模组的两端侧面设置有侧防护网,拼接模组的外侧面设置有面防护网,该方法包括设计与选材,交叉施工,吊装组合。本发明在采用模块化设计的基础上,模块的拼接工序可以交叉同时进行,一方面可增加施工效率,缩短工期,另一方面也能大幅度减少高空拼接作业的作业量,从而增加了施工的安全性。
Construction process of attached lifting scaffold under variable working conditions of structural outline and floor height
一种结构轮廓及层高多变工况下附着升降脚手架施工工艺
ZHANG CHAO (Autor:in) / HAN JUNG-HO (Autor:in) / LIAO FUXING (Autor:in) / YUAN SHUAI (Autor:in) / YANG SHENGKAI (Autor:in)
12.04.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Floor construction method for attached lifting scaffold