Prefabricated wall cavity pouring construction method
The invention relates to the technical field of building construction, in particular to a prefabricated wall cavity pouring construction method which comprises the steps that positioning steel bars are embedded, a prefabricated wall is installed, a plurality of supporting devices are installed on one side of the installed prefabricated wall to support the prefabricated wall, and concrete is poured into a cavity of the prefabricated wall. The real-time inclination angle of the prefabricated wall body and the real-time pressure of the long supporting rod and the short supporting rod are monitored in the concrete pouring process, the position of the prefabricated wall body during concrete pouring is monitored at any time, and judgment is conducted according to the first preset angle, the second preset angle, the standard pressure of the long supporting rod and the standard pressure of the short supporting rod; according to the method, the support device can be adjusted to ensure that any tiny position problem of the prefabricated wall body can be monitored and corresponding adjustment can be made, so that the accuracy of the position of the prefabricated wall body during concrete pouring is ensured.
本发明涉及建筑施工技术领域,尤其涉及一种预制墙体空腔浇筑施工方法,包括,预埋定位钢筋,安装预制墙体,在安装完成的预制墙体一侧安装若干支撑装置对预制墙体进行支护,并将混凝土浇注至预制墙体的空腔内。本发明通过在混凝土浇筑的过程中监测预制墙体实时倾斜角度和长支撑杆和短支撑杆的实时压力,时刻监测着混凝土浇筑时预制墙体的位置,根据第一预设角度、第二预设角度、长支撑杆标准压力和短支撑杆标准压力进行判定,以确定如何调整支撑装置,确保预制墙体出现任何一点细微的位置问题都会被监测到并做出相应的调整,保障了混凝土浇筑时,预制墙体位置的准确性。
Prefabricated wall cavity pouring construction method
The invention relates to the technical field of building construction, in particular to a prefabricated wall cavity pouring construction method which comprises the steps that positioning steel bars are embedded, a prefabricated wall is installed, a plurality of supporting devices are installed on one side of the installed prefabricated wall to support the prefabricated wall, and concrete is poured into a cavity of the prefabricated wall. The real-time inclination angle of the prefabricated wall body and the real-time pressure of the long supporting rod and the short supporting rod are monitored in the concrete pouring process, the position of the prefabricated wall body during concrete pouring is monitored at any time, and judgment is conducted according to the first preset angle, the second preset angle, the standard pressure of the long supporting rod and the standard pressure of the short supporting rod; according to the method, the support device can be adjusted to ensure that any tiny position problem of the prefabricated wall body can be monitored and corresponding adjustment can be made, so that the accuracy of the position of the prefabricated wall body during concrete pouring is ensured.
本发明涉及建筑施工技术领域,尤其涉及一种预制墙体空腔浇筑施工方法,包括,预埋定位钢筋,安装预制墙体,在安装完成的预制墙体一侧安装若干支撑装置对预制墙体进行支护,并将混凝土浇注至预制墙体的空腔内。本发明通过在混凝土浇筑的过程中监测预制墙体实时倾斜角度和长支撑杆和短支撑杆的实时压力,时刻监测着混凝土浇筑时预制墙体的位置,根据第一预设角度、第二预设角度、长支撑杆标准压力和短支撑杆标准压力进行判定,以确定如何调整支撑装置,确保预制墙体出现任何一点细微的位置问题都会被监测到并做出相应的调整,保障了混凝土浇筑时,预制墙体位置的准确性。
Prefabricated wall cavity pouring construction method
一种预制墙体空腔浇筑施工方法
YANG SHANSHAN (Autor:in) / LIU XINJIA (Autor:in) / YANG HAO (Autor:in) / GAO QIANG (Autor:in) / MENG XIAOQING (Autor:in) / LU MIN (Autor:in)
12.04.2024
Patent
Elektronische Ressource
Chinesisch
Prefabricated wall framework and pouring method thereof
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Prefabricated cavity shear wall construction structure and analysis construction method
Europäisches Patentamt | 2023
|