Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Quickly-assembled core tube applied to high-rise modular building
The rapidly-assembled core tube applied to the high-rise modular building comprises a steel frame column, a prefabricated steel plate shear wall and a steel frame bottom beam, the bottom of the steel frame column is connected with the two ends of the steel frame bottom beam, and the bottom of the prefabricated steel plate shear wall is assembled and connected with the upper portion of the steel frame bottom beam through a clamping groove and a clamping piece; the two ends of a steel frame beam of the prefabricated steel plate shear wall are connected with steel frame columns to form a steel plate shear wall, the steel plate shear walls of different planes are combined in space to form a first truss shear wall structure, a second truss shear wall structure is spliced on the basis of the first truss shear wall structure, and the second truss shear wall structure is spliced layer by layer one by one. And the core tube with an integral structure is formed. The method has the advantages that the construction efficiency can be effectively improved, the requirements of building industrialization can be met, the carbon emission in the construction process can be reduced, the national dual-carbon strategic target is met, the quality is more reliable, and the economical efficiency is better.
应用于高层模块化建筑的快速拼装的核心筒,包括钢框架柱、预制钢板剪力墙和钢框架底梁,所述钢框架柱的底部与钢框架底梁的两端相连接,所述预制钢板剪力墙的底部与钢框架底梁的上部通过卡槽以及卡件装配连接,所述预制钢板剪力墙的钢框架梁的两端与钢框架柱相连接,形成一面钢板剪力墙,不同平面的钢板剪力墙在空间中组合形成第一榀剪力墙结构,在第一榀剪力墙结构基础上拼装第二榀剪力墙结构,以此按层逐榀拼装,直至形成整体结构的核心筒。本发明具有能有效提高施工效率,满足建筑工业化的要求,能降低施工过程中的碳排放量,符合国家的“双碳”战略目标,而且质量更可靠、经济性更好等优点。
Quickly-assembled core tube applied to high-rise modular building
The rapidly-assembled core tube applied to the high-rise modular building comprises a steel frame column, a prefabricated steel plate shear wall and a steel frame bottom beam, the bottom of the steel frame column is connected with the two ends of the steel frame bottom beam, and the bottom of the prefabricated steel plate shear wall is assembled and connected with the upper portion of the steel frame bottom beam through a clamping groove and a clamping piece; the two ends of a steel frame beam of the prefabricated steel plate shear wall are connected with steel frame columns to form a steel plate shear wall, the steel plate shear walls of different planes are combined in space to form a first truss shear wall structure, a second truss shear wall structure is spliced on the basis of the first truss shear wall structure, and the second truss shear wall structure is spliced layer by layer one by one. And the core tube with an integral structure is formed. The method has the advantages that the construction efficiency can be effectively improved, the requirements of building industrialization can be met, the carbon emission in the construction process can be reduced, the national dual-carbon strategic target is met, the quality is more reliable, and the economical efficiency is better.
应用于高层模块化建筑的快速拼装的核心筒,包括钢框架柱、预制钢板剪力墙和钢框架底梁,所述钢框架柱的底部与钢框架底梁的两端相连接,所述预制钢板剪力墙的底部与钢框架底梁的上部通过卡槽以及卡件装配连接,所述预制钢板剪力墙的钢框架梁的两端与钢框架柱相连接,形成一面钢板剪力墙,不同平面的钢板剪力墙在空间中组合形成第一榀剪力墙结构,在第一榀剪力墙结构基础上拼装第二榀剪力墙结构,以此按层逐榀拼装,直至形成整体结构的核心筒。本发明具有能有效提高施工效率,满足建筑工业化的要求,能降低施工过程中的碳排放量,符合国家的“双碳”战略目标,而且质量更可靠、经济性更好等优点。
Quickly-assembled core tube applied to high-rise modular building
应用于高层模块化建筑的快速拼装的核心筒
KANG XIN (Autor:in) / CHEN HAO (Autor:in) / ZHANG MINGLIANG (Autor:in) / ZHONG XU (Autor:in) / WANG XIAOXIANG (Autor:in)
26.04.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Modular honeycomb building capable of being assembled quickly
Europäisches Patentamt | 2020
|Quickly-installed prefabricated assembled building frame
Europäisches Patentamt | 2020
|