Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Laminated wall in reinforced concrete modular building and construction method thereof
The invention discloses a laminated wall in a reinforced concrete modular building and a construction method thereof, and the construction method of the laminated wall in the reinforced concrete modular building comprises the steps that two prefabricated modules are provided, and a first wall body and a second wall body are formed on the two prefabricated modules respectively; a drag hook is installed on the first wall body, and a pull ring is hinged to the second wall body; the two prefabricated modules are installed in the installation area, the first wall body and the second wall body are arranged in a spaced mode to form a pouring cavity, and reinforcing steel bars are bound in the pouring cavity; wherein the drag hook and the pull ring are both located in the pouring cavity; the pull ring is rotated to be matched with the pull hook in a hooking mode, so that the first wall body and the second wall body are connected; and concrete is poured into the pouring cavity, and installation of the composite wall in the reinforced concrete modular building is completed. According to the prefabricated module, a large number of through-wall opposite-pull screws do not need to be arranged to connect the first wall body and the second wall body, the factory prefabrication rate of interior decoration of the prefabricated module is increased, and the workload of field reworking is reduced.
本发明公开了一种钢筋混凝土模块化建筑中的叠合墙及其施工方法,钢筋混凝土模块化建筑中的叠合墙及其施工方法包括:提供两个预制模块,两个预制模块上分别形成有第一墙体和第二墙体;在第一墙体安装拉钩,并在第二墙体上铰接拉环;将两个预制模块安装于安装区域,使第一墙体和第二墙体间隔设置形成一浇筑腔,并在浇筑腔内绑扎钢筋;其中,拉钩和拉环均位于浇筑腔内;将拉环转动至与拉钩钩接配合,以将第一墙体和第二墙体连接;向浇筑腔内浇筑混凝土,钢筋混凝土模块化建筑中的叠合墙安装完成。本发明无需设置大量的穿墙对拉螺杆以将第一墙体和第二墙体连接,提高了预制模块的内部装修的工厂预制率,且减少了现场返工的工作量。
Laminated wall in reinforced concrete modular building and construction method thereof
The invention discloses a laminated wall in a reinforced concrete modular building and a construction method thereof, and the construction method of the laminated wall in the reinforced concrete modular building comprises the steps that two prefabricated modules are provided, and a first wall body and a second wall body are formed on the two prefabricated modules respectively; a drag hook is installed on the first wall body, and a pull ring is hinged to the second wall body; the two prefabricated modules are installed in the installation area, the first wall body and the second wall body are arranged in a spaced mode to form a pouring cavity, and reinforcing steel bars are bound in the pouring cavity; wherein the drag hook and the pull ring are both located in the pouring cavity; the pull ring is rotated to be matched with the pull hook in a hooking mode, so that the first wall body and the second wall body are connected; and concrete is poured into the pouring cavity, and installation of the composite wall in the reinforced concrete modular building is completed. According to the prefabricated module, a large number of through-wall opposite-pull screws do not need to be arranged to connect the first wall body and the second wall body, the factory prefabrication rate of interior decoration of the prefabricated module is increased, and the workload of field reworking is reduced.
本发明公开了一种钢筋混凝土模块化建筑中的叠合墙及其施工方法,钢筋混凝土模块化建筑中的叠合墙及其施工方法包括:提供两个预制模块,两个预制模块上分别形成有第一墙体和第二墙体;在第一墙体安装拉钩,并在第二墙体上铰接拉环;将两个预制模块安装于安装区域,使第一墙体和第二墙体间隔设置形成一浇筑腔,并在浇筑腔内绑扎钢筋;其中,拉钩和拉环均位于浇筑腔内;将拉环转动至与拉钩钩接配合,以将第一墙体和第二墙体连接;向浇筑腔内浇筑混凝土,钢筋混凝土模块化建筑中的叠合墙安装完成。本发明无需设置大量的穿墙对拉螺杆以将第一墙体和第二墙体连接,提高了预制模块的内部装修的工厂预制率,且减少了现场返工的工作量。
Laminated wall in reinforced concrete modular building and construction method thereof
钢筋混凝土模块化建筑中的叠合墙及其施工方法
ZOU XIAOKANG (Autor:in) / HUANG JIANG (Autor:in) / LYU WENJIE (Autor:in) / SHI JUN (Autor:in) / ZHAO ZHEN (Autor:in) / SHI TIAN (Autor:in) / JIAN HAOFENG (Autor:in) / ZHANG YANG (Autor:in) / HE ZHONGCAI (Autor:in) / HE CHENGHUA (Autor:in)
26.04.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Concrete composite wall modular building system and construction method thereof
Europäisches Patentamt | 2024
|Concrete prefabricated wall modular building system and construction method thereof
Europäisches Patentamt | 2024
|Reinforced concrete frame-shear wall building structure and construction method thereof
Europäisches Patentamt | 2024
|Modular reinforced concrete structure and construction method thereof
Europäisches Patentamt | 2024
|Prefabricated reinforced concrete laminated slab and construction method thereof
Europäisches Patentamt | 2023
|