Pipe gallery frame foundation and installation method thereof
The invention discloses a pipe gallery frame foundation and a mounting method thereof, and belongs to the technical field of constructional engineering. The pipe gallery frame foundation comprises a bearing platform and a column body located above the bearing platform. Steel bar keels are arranged in the bearing platform and the column body, and foundation bolts used for extending to the outer side of the top of the column body are arranged on the steel bar keels. A plurality of sets of first pre-embedded grouting sleeves and second pre-embedded grouting sleeves are arranged on the bearing platform, the bottom ends of the second pre-embedded grouting sleeves extend to the center of the bottom of the bearing platform, and a hoisting sleeve is arranged on the column body. The pipe gallery frame foundation is manufactured in a centralized mode in the background, efficiency is high, cost is low, the foundation is manufactured in the centralized mode in the background, management is convenient, and the construction period is shortened. The foundation quality is improved, common quality problems such as voids and pitted surfaces are effectively avoided, the purpose of improving quality and efficiency is achieved, and meanwhile background foundation centralized manufacturing is conducted without being affected by the construction period.
本发明公开了建筑工程技术领域的一种管廊架基础及其安装方法,包括:承台以及处于承台上方的柱体;所述承台与柱体的内部设有钢筋龙骨,所述钢筋龙骨上设有用于延伸至柱体顶部外侧的地脚螺栓;所述承台上设有若干组第一预埋灌浆套管与第二预埋灌浆套管,所述第二预埋灌浆套管的底端延伸至承台的底部中心,所述柱体上设有吊装套管,本申请中采取后台集中制作管廊架基础,效率高、成本低,并且后台集中制作基础,便于管理,有利于提高基础质量,有效避免蜂窝麻面等质量通病,实现提质增效的目的,同时,进行后台基础集中制作,不受工期影响。
Pipe gallery frame foundation and installation method thereof
The invention discloses a pipe gallery frame foundation and a mounting method thereof, and belongs to the technical field of constructional engineering. The pipe gallery frame foundation comprises a bearing platform and a column body located above the bearing platform. Steel bar keels are arranged in the bearing platform and the column body, and foundation bolts used for extending to the outer side of the top of the column body are arranged on the steel bar keels. A plurality of sets of first pre-embedded grouting sleeves and second pre-embedded grouting sleeves are arranged on the bearing platform, the bottom ends of the second pre-embedded grouting sleeves extend to the center of the bottom of the bearing platform, and a hoisting sleeve is arranged on the column body. The pipe gallery frame foundation is manufactured in a centralized mode in the background, efficiency is high, cost is low, the foundation is manufactured in the centralized mode in the background, management is convenient, and the construction period is shortened. The foundation quality is improved, common quality problems such as voids and pitted surfaces are effectively avoided, the purpose of improving quality and efficiency is achieved, and meanwhile background foundation centralized manufacturing is conducted without being affected by the construction period.
本发明公开了建筑工程技术领域的一种管廊架基础及其安装方法,包括:承台以及处于承台上方的柱体;所述承台与柱体的内部设有钢筋龙骨,所述钢筋龙骨上设有用于延伸至柱体顶部外侧的地脚螺栓;所述承台上设有若干组第一预埋灌浆套管与第二预埋灌浆套管,所述第二预埋灌浆套管的底端延伸至承台的底部中心,所述柱体上设有吊装套管,本申请中采取后台集中制作管廊架基础,效率高、成本低,并且后台集中制作基础,便于管理,有利于提高基础质量,有效避免蜂窝麻面等质量通病,实现提质增效的目的,同时,进行后台基础集中制作,不受工期影响。
Pipe gallery frame foundation and installation method thereof
一种管廊架基础及其安装方法
WANG YONGWEN (Autor:in) / WANG FENGYU (Autor:in) / XUE SUPING (Autor:in) / LIU XU (Autor:in)
30.04.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pipe gallery prefabricated installation construction method