Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Inflatable large floating bridge and working method thereof
According to the inflatable large floating bridge and the working method thereof, under the condition that the same buoyancy capacity is provided, the overall weight and the transportation occupied space are greatly reduced, the transportation cost and the maintenance cost are greatly saved, the installation size of the floating bridge can be adjusted according to the site situation, and the floating bridge can be rapidly laid and dismantled. The bridge body system comprises a plurality of inflatable floating body units, the whole inflatable floating bag is in a spindle shape, the upper surface of the inflatable floating bag is a plane, rubber rods are transversely welded to the plane at certain intervals, and the air bag fixing strap is wound around the outer surface of the inflatable floating bag. A buckle of the air bag fixing strap is welded and fixed to the position separated from the space of the floating bag, the inflation air nozzles are arranged on the left side and the right side of the floating bag, and an inner cavity separation piece is arranged in the floating bag. The bridge body system is fixed to the two banks through the stabilizing system. Round-bar-shaped solid protrusions of three buckles are arranged at the edge position where the bridge body panel and the bridge floor are spliced, and the bridge body panel and the upper surface of the inflatable floating bag are connected together in a buckled mode through the buckles.
充气式的大型浮桥及其工作方法,在提供同等浮力容量的情况下,整体重量、运输占用空间大大减小,大大节省运输成本和维护维修费用,可根据场地情况调整浮桥的安装尺寸,能够快速布设和拆除。桥体本体系统包括若干个充气浮体单元,充气的充气式浮囊整体呈纺锤状且上表面为平面,在该平面上横向每间隔一定距离焊接一个橡胶棒,气囊固定束带绕在充气式浮囊的外表面,气囊固定束带的卡扣焊接固定在与浮囊空间隔断的位置上,充气气嘴设在浮囊的左右两侧,浮囊内部具有内部腔室分隔片;稳定系统将桥体本体系统固定到两岸;在桥体面板与桥面拼接的边缘位置上设置三道卡扣的圆棒状实心突起,通过卡扣将桥体面板与充气式浮囊上表面扣接在一起。
Inflatable large floating bridge and working method thereof
According to the inflatable large floating bridge and the working method thereof, under the condition that the same buoyancy capacity is provided, the overall weight and the transportation occupied space are greatly reduced, the transportation cost and the maintenance cost are greatly saved, the installation size of the floating bridge can be adjusted according to the site situation, and the floating bridge can be rapidly laid and dismantled. The bridge body system comprises a plurality of inflatable floating body units, the whole inflatable floating bag is in a spindle shape, the upper surface of the inflatable floating bag is a plane, rubber rods are transversely welded to the plane at certain intervals, and the air bag fixing strap is wound around the outer surface of the inflatable floating bag. A buckle of the air bag fixing strap is welded and fixed to the position separated from the space of the floating bag, the inflation air nozzles are arranged on the left side and the right side of the floating bag, and an inner cavity separation piece is arranged in the floating bag. The bridge body system is fixed to the two banks through the stabilizing system. Round-bar-shaped solid protrusions of three buckles are arranged at the edge position where the bridge body panel and the bridge floor are spliced, and the bridge body panel and the upper surface of the inflatable floating bag are connected together in a buckled mode through the buckles.
充气式的大型浮桥及其工作方法,在提供同等浮力容量的情况下,整体重量、运输占用空间大大减小,大大节省运输成本和维护维修费用,可根据场地情况调整浮桥的安装尺寸,能够快速布设和拆除。桥体本体系统包括若干个充气浮体单元,充气的充气式浮囊整体呈纺锤状且上表面为平面,在该平面上横向每间隔一定距离焊接一个橡胶棒,气囊固定束带绕在充气式浮囊的外表面,气囊固定束带的卡扣焊接固定在与浮囊空间隔断的位置上,充气气嘴设在浮囊的左右两侧,浮囊内部具有内部腔室分隔片;稳定系统将桥体本体系统固定到两岸;在桥体面板与桥面拼接的边缘位置上设置三道卡扣的圆棒状实心突起,通过卡扣将桥体面板与充气式浮囊上表面扣接在一起。
Inflatable large floating bridge and working method thereof
充气式的大型浮桥及其工作方法
JIAO LIANG (Autor:in) / SONG DECHUN (Autor:in) / YANG FANGYU (Autor:in)
03.05.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Combined inflatable floating bridge system and mounting method thereof
Europäisches Patentamt | 2023
|Inflatable large-span high-load-bearing emergency bridge
Europäisches Patentamt | 2023
|Inflatable Energy Storage with floating solar generation
Europäisches Patentamt | 2018
|