Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
720-degree dome-screen cinema dome construction method
The invention discloses a 720-degree dome-screen cinema dome construction method, and relates to the field of dome construction, and the technical scheme is that the method comprises the following steps: S1, surveying and setting out: carrying out longitude and latitude division on a shell structure by using a BIM model, and extracting key point coordinates; s2, shaping keel processing and positioning and template processing: processing an arc-shaped keel and a template according to the curvature of a field shell; s3, frame body layered supporting is conducted, specifically, according to a concrete layered pouring scheme, double-row scaffolds are erected in a segmented mode to serve as an operation platform and an outer protection frame; and S4, layered pouring of the self-compacting concrete. The method has the beneficial effects that 1, through research and application of a longitude and latitude paying-off technology based on the BIM model, accurate coordinates of any point position of the shell structure can be rapidly and accurately obtained in the construction process, paying-off accuracy is ensured, and a design intention can be perfectly presented;
本发明公开了一种720度球幕影院穹顶施工方法,涉及穹顶施工领域,技术方案为,包括以下步骤:S1、测量放线:利用BIM模型对壳体结构进行经纬线划分,并提取关键点坐标;S2、定型龙骨加工定位及模板加工:根据现场壳体的弯曲度对弧形龙骨及模板进行加工;S3、架体分层支设:根据混凝土分层浇筑方案,分段搭设双排脚手架作为操作平台及外防护架;S4、自密实混凝土分层浇筑。本发明的有益效果是:1、通过基于BIM模型的经纬放线技术的研究与应用,施工过程中能够快速、准确获取壳体结构任何点位的精准坐标,确保放线的准确性,能够将设计意图完美的呈现。
720-degree dome-screen cinema dome construction method
The invention discloses a 720-degree dome-screen cinema dome construction method, and relates to the field of dome construction, and the technical scheme is that the method comprises the following steps: S1, surveying and setting out: carrying out longitude and latitude division on a shell structure by using a BIM model, and extracting key point coordinates; s2, shaping keel processing and positioning and template processing: processing an arc-shaped keel and a template according to the curvature of a field shell; s3, frame body layered supporting is conducted, specifically, according to a concrete layered pouring scheme, double-row scaffolds are erected in a segmented mode to serve as an operation platform and an outer protection frame; and S4, layered pouring of the self-compacting concrete. The method has the beneficial effects that 1, through research and application of a longitude and latitude paying-off technology based on the BIM model, accurate coordinates of any point position of the shell structure can be rapidly and accurately obtained in the construction process, paying-off accuracy is ensured, and a design intention can be perfectly presented;
本发明公开了一种720度球幕影院穹顶施工方法,涉及穹顶施工领域,技术方案为,包括以下步骤:S1、测量放线:利用BIM模型对壳体结构进行经纬线划分,并提取关键点坐标;S2、定型龙骨加工定位及模板加工:根据现场壳体的弯曲度对弧形龙骨及模板进行加工;S3、架体分层支设:根据混凝土分层浇筑方案,分段搭设双排脚手架作为操作平台及外防护架;S4、自密实混凝土分层浇筑。本发明的有益效果是:1、通过基于BIM模型的经纬放线技术的研究与应用,施工过程中能够快速、准确获取壳体结构任何点位的精准坐标,确保放线的准确性,能够将设计意图完美的呈现。
720-degree dome-screen cinema dome construction method
一种720度球幕影院穹顶施工方法
ZHANG YUNPENG (Autor:in) / CHEN JIANG (Autor:in) / MA WEI (Autor:in) / YUAN ZHUANG (Autor:in) / ZHANG RUCHAO (Autor:in) / YUAN HENGSEN (Autor:in) / MENG LINGHONG (Autor:in) / ZHANG GUANGCHAO (Autor:in) / WANG TONGGANG (Autor:in) / ZHAO YANMIAO (Autor:in)
03.05.2024
Patent
Elektronische Ressource
Chinesisch
Suspension type dome cinema system of novel dome cinema
Europäisches Patentamt | 2021
|Engineering Index Backfile | 1927