Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method for building waterproof engineering
The invention discloses a construction method for building waterproof engineering, which specifically comprises the following steps: S1, foundation treatment: before construction, foreign matters on the surface of a foundation are cleaned, bumps, mortar bumps and dust possibly existing on the surface are thoroughly swept, and cement mortar is used for leveling; the invention relates to the technical field of building waterproof engineering. According to the construction method for the building waterproof engineering, coiled materials of roofing joints and special parts are treated, that is, waterproof paint is used as an additional layer within the diameter range of 500 mm around a water falling opening, and the thickness is gt; 2 mm; the root of the pipeline extending out of the roof is treated; a waterproof additional layer is additionally arranged at the corner of the roof and the vertical wall, the corner is made into a circular arc shape, the head of the parapet wall is cut to be flat, and a piece of waterproof cold glue is brushed; and finally, the base layers at the internal and external corners are coated with sealant after being glued, so that the waterproof performance of the roof joints and special parts is effectively improved.
本发明公开了一种用于建筑防水工程施工方法,具体包括以下步骤:S1、地基处理:施工前,应对地基表面的异物进行清洁处理,将表面可能存在的突起物、砂浆疙瘩、尘土进行彻底清扫,并用水泥砂浆进行找平;本发明涉及建筑防水工程技术领域。该用于建筑防水工程施工方法,对天面节点和特殊部位的卷材处理,即:在水落口周围直径500mm范围内用防水涂料作附加层,且厚度>2mm;对伸出屋面管道根部进行处理;再对天面与立墙转角处加设一层防水附加层,对转角处做成圆弧形,女儿墙收头割平,并用防水冷胶料涂刷一片;最后在阴阳角处的基层涂胶后用密封膏涂封,有效提高了天面节点以及特殊部位的防水性能。
Construction method for building waterproof engineering
The invention discloses a construction method for building waterproof engineering, which specifically comprises the following steps: S1, foundation treatment: before construction, foreign matters on the surface of a foundation are cleaned, bumps, mortar bumps and dust possibly existing on the surface are thoroughly swept, and cement mortar is used for leveling; the invention relates to the technical field of building waterproof engineering. According to the construction method for the building waterproof engineering, coiled materials of roofing joints and special parts are treated, that is, waterproof paint is used as an additional layer within the diameter range of 500 mm around a water falling opening, and the thickness is gt; 2 mm; the root of the pipeline extending out of the roof is treated; a waterproof additional layer is additionally arranged at the corner of the roof and the vertical wall, the corner is made into a circular arc shape, the head of the parapet wall is cut to be flat, and a piece of waterproof cold glue is brushed; and finally, the base layers at the internal and external corners are coated with sealant after being glued, so that the waterproof performance of the roof joints and special parts is effectively improved.
本发明公开了一种用于建筑防水工程施工方法,具体包括以下步骤:S1、地基处理:施工前,应对地基表面的异物进行清洁处理,将表面可能存在的突起物、砂浆疙瘩、尘土进行彻底清扫,并用水泥砂浆进行找平;本发明涉及建筑防水工程技术领域。该用于建筑防水工程施工方法,对天面节点和特殊部位的卷材处理,即:在水落口周围直径500mm范围内用防水涂料作附加层,且厚度>2mm;对伸出屋面管道根部进行处理;再对天面与立墙转角处加设一层防水附加层,对转角处做成圆弧形,女儿墙收头割平,并用防水冷胶料涂刷一片;最后在阴阳角处的基层涂胶后用密封膏涂封,有效提高了天面节点以及特殊部位的防水性能。
Construction method for building waterproof engineering
一种用于建筑防水工程施工方法
CHEN MINGCHONG (Autor:in)
03.05.2024
Patent
Elektronische Ressource
Chinesisch
Building waterproof engineering waterproof construction post-processing method
Europäisches Patentamt | 2020
|Building waterproof engineering construction treatment method
Europäisches Patentamt | 2022
|Waterproof paint brushing construction method for building waterproof engineering
Europäisches Patentamt | 2021
|