Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building construction platform facilitating material lifting
The invention discloses a building construction platform facilitating material lifting, and belongs to the technical field of building construction. The construction platform comprises a liftable working platform, one side of the working platform is connected with a bearing frame, the bearing frame is connected with a winding control device, the bearing frame is in sliding connection with the first track, and the working platform drives the bearing frame to synchronously ascend and descend along the first track while ascending and descending; the winding control device is connected with the lifting plate through a pulley block and a traction rope, and a cart used for containing materials is arranged at the top of the lifting plate. The bearing frame is provided with a second rail, and the lifting plate is in sliding connection with the second rail through an arranged sliding block; the lifting type lifting plate can be matched with the cart, materials can change along with the height of the building construction platform during lifting, the height of the lifting plate is flexibly adjusted by controlling winding of the traction rope, and therefore the materials of different heights can be lifted.
本发明公开了一种方便提升物料的建筑施工平台,属于建筑施工技术领域;所述施工平台包括可升降的工作平台,工作平台的一侧连接有承接架,承接架连接有收卷控制装置,承接架与第一轨道滑动连接,工作平台升降的同时带动承接架沿着第一轨道同步升降;收卷控制装置通过滑轮组和牵引绳与升降板相连接,升降板顶部设有用于放置物料的推车;承接架设置有第二轨道,升降板通过设置的滑块与第二轨道滑动连接;本发明可以通过升降式的升降板与推车配合,让物料可以在提升时可以随着建筑施工平台的高度变化,通过控制牵引绳的收卷来灵活的调整升降板的高度,来进行不同高度的物料提升。
Building construction platform facilitating material lifting
The invention discloses a building construction platform facilitating material lifting, and belongs to the technical field of building construction. The construction platform comprises a liftable working platform, one side of the working platform is connected with a bearing frame, the bearing frame is connected with a winding control device, the bearing frame is in sliding connection with the first track, and the working platform drives the bearing frame to synchronously ascend and descend along the first track while ascending and descending; the winding control device is connected with the lifting plate through a pulley block and a traction rope, and a cart used for containing materials is arranged at the top of the lifting plate. The bearing frame is provided with a second rail, and the lifting plate is in sliding connection with the second rail through an arranged sliding block; the lifting type lifting plate can be matched with the cart, materials can change along with the height of the building construction platform during lifting, the height of the lifting plate is flexibly adjusted by controlling winding of the traction rope, and therefore the materials of different heights can be lifted.
本发明公开了一种方便提升物料的建筑施工平台,属于建筑施工技术领域;所述施工平台包括可升降的工作平台,工作平台的一侧连接有承接架,承接架连接有收卷控制装置,承接架与第一轨道滑动连接,工作平台升降的同时带动承接架沿着第一轨道同步升降;收卷控制装置通过滑轮组和牵引绳与升降板相连接,升降板顶部设有用于放置物料的推车;承接架设置有第二轨道,升降板通过设置的滑块与第二轨道滑动连接;本发明可以通过升降式的升降板与推车配合,让物料可以在提升时可以随着建筑施工平台的高度变化,通过控制牵引绳的收卷来灵活的调整升降板的高度,来进行不同高度的物料提升。
Building construction platform facilitating material lifting
一种方便提升物料的建筑施工平台
HU YUNLIANG (Autor:in) / YIN SHENGBING (Autor:in) / LI SHUHUI (Autor:in) / LI HUIQIN (Autor:in) / QIN XIAONING (Autor:in) / ZHANG CHONG (Autor:in) / HAN YUKUN (Autor:in) / LIU TAO (Autor:in) / QIANG BIN (Autor:in) / PEI ZHIBIN (Autor:in)
03.05.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste