Reverse construction process for firstly hooping and then erecting ribs of large-section column
The invention relates to a reverse construction process for a large-section column, which belongs to the technical field of building construction and comprises the following steps of: (1) manufacturing a column rib; (2) outer hoop marking and column angle stud marking are carried out; (3) an operation frame is erected; (4) column angle vertical ribs are installed; (5) stirrups are installed; (6) four edges are corrected and temporarily fixed; (7) mounting vertical ribs in the column; (8) binding and forming; and (9) the temporary fixing and operating frame is dismantled. By adopting the reverse construction method of firstly hooping and then erecting the ribs, the working efficiency can be greatly improved, the labor intensity is reduced, the forming effect of the column ribs is attractive, the quality effect is excellent, obvious social benefits and economic benefits can be obtained, and the method has universal popularization and application values.
一种大截面柱先箍筋后立筋逆作施工工艺,属建筑施工技术领域,该工艺包括以下步骤:步骤(1):柱筋制作;步骤(2):外箍标记、柱角立筋标记;步骤(3):操作架搭设;步骤(4):柱角立筋安装;步骤(5):箍筋安装;步骤(6):四边校正及临时固定;步骤(7):柱内立筋安装;步骤(8):绑扎成型;步骤(9):拆除临时固定与操作架。本发明采用先箍筋后立筋的逆作法施工,可以大幅度提高工作效率,减小劳动强度,柱筋成型效果美观,质量效果优良,能取得显著的社会效益和经济效益,具有普遍的推广应用价值。
Reverse construction process for firstly hooping and then erecting ribs of large-section column
The invention relates to a reverse construction process for a large-section column, which belongs to the technical field of building construction and comprises the following steps of: (1) manufacturing a column rib; (2) outer hoop marking and column angle stud marking are carried out; (3) an operation frame is erected; (4) column angle vertical ribs are installed; (5) stirrups are installed; (6) four edges are corrected and temporarily fixed; (7) mounting vertical ribs in the column; (8) binding and forming; and (9) the temporary fixing and operating frame is dismantled. By adopting the reverse construction method of firstly hooping and then erecting the ribs, the working efficiency can be greatly improved, the labor intensity is reduced, the forming effect of the column ribs is attractive, the quality effect is excellent, obvious social benefits and economic benefits can be obtained, and the method has universal popularization and application values.
一种大截面柱先箍筋后立筋逆作施工工艺,属建筑施工技术领域,该工艺包括以下步骤:步骤(1):柱筋制作;步骤(2):外箍标记、柱角立筋标记;步骤(3):操作架搭设;步骤(4):柱角立筋安装;步骤(5):箍筋安装;步骤(6):四边校正及临时固定;步骤(7):柱内立筋安装;步骤(8):绑扎成型;步骤(9):拆除临时固定与操作架。本发明采用先箍筋后立筋的逆作法施工,可以大幅度提高工作效率,减小劳动强度,柱筋成型效果美观,质量效果优良,能取得显著的社会效益和经济效益,具有普遍的推广应用价值。
Reverse construction process for firstly hooping and then erecting ribs of large-section column
一种大截面柱先箍筋后立筋逆作施工工艺
YANG QIANCHENG (Autor:in) / ZHOU YOU (Autor:in) / LIU TANGJIN (Autor:in) / LU LIXING (Autor:in) / QIU XIANDE (Autor:in) / CAO XIN (Autor:in) / YANG FEI (Autor:in) / SUN TAO (Autor:in) / WANG CHENG (Autor:in) / XU TAN (Autor:in)
03.05.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2022
|Hooping apparatus for concrete column construction joints
Europäisches Patentamt | 2015
|Formwork hooping device at concrete column construction joint
Europäisches Patentamt | 2023
|Formwork hooping device at concrete column construction joint
Europäisches Patentamt | 2023
|Building method for firstly decorating and then building wall
Europäisches Patentamt | 2023
|