Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Flood discharge tunnel inlet structure and method suitable for silt-laden and rock-laden river
The invention provides a spillway tunnel inlet structure and method suitable for a silt-laden multi-block stone river. The spillway tunnel inlet structure comprises a bottom plate, a left pier, a right pier, a middle pier, a left connecting beam and a right connecting beam. The middle pier is arranged between the left pier and the right pier, the left connecting beam is arranged between the top of the left side of the middle pier and the top of the left pier, and the middle pier and the left pier are connected through the left connecting beam; and the right connecting beam is arranged between the top of the right side of the middle pier and the top of the right pier, so that the middle pier and the right pier are connected through the right connecting beam. The method is suitable for river flood discharge tunnel inlet structure design with large river sediment amount and many large stones, the problem of sediment deposition can be effectively solved, the problem that the structure of a flood discharge tunnel body is stable due to the fact that sediment and the large stones enter the flood discharge tunnel is solved, the normal flood discharge function of the flood discharge tunnel is guaranteed, and meanwhile structural stability and safety are guaranteed.
本发明提供一种适用于多泥沙多块石河流的泄洪洞进口结构及方法,包括底板、左边墩、右边墩、中墩、左联系梁和右联系梁;在所述左边墩和所述右边墩之间,设置所述中墩,所述中墩的左侧顶部和所述左边墩的顶部之间设置所述左联系梁,使所述中墩和所述左边墩通过所述左联系梁连接;所述中墩的右侧顶部和所述右边墩的顶部之间设置所述右联系梁,使所述中墩和所述右边墩通过所述右联系梁连接。本发明适用于河道泥沙量大、大块石多等河流泄洪洞进口结构设计,可有效处理泥沙淤积问题、防止泥沙及块石进入泄洪洞造成泄洪洞洞身结构稳定等问题,保证了泄洪洞的正常泄洪功能,同时保证结构稳定及安全。
Flood discharge tunnel inlet structure and method suitable for silt-laden and rock-laden river
The invention provides a spillway tunnel inlet structure and method suitable for a silt-laden multi-block stone river. The spillway tunnel inlet structure comprises a bottom plate, a left pier, a right pier, a middle pier, a left connecting beam and a right connecting beam. The middle pier is arranged between the left pier and the right pier, the left connecting beam is arranged between the top of the left side of the middle pier and the top of the left pier, and the middle pier and the left pier are connected through the left connecting beam; and the right connecting beam is arranged between the top of the right side of the middle pier and the top of the right pier, so that the middle pier and the right pier are connected through the right connecting beam. The method is suitable for river flood discharge tunnel inlet structure design with large river sediment amount and many large stones, the problem of sediment deposition can be effectively solved, the problem that the structure of a flood discharge tunnel body is stable due to the fact that sediment and the large stones enter the flood discharge tunnel is solved, the normal flood discharge function of the flood discharge tunnel is guaranteed, and meanwhile structural stability and safety are guaranteed.
本发明提供一种适用于多泥沙多块石河流的泄洪洞进口结构及方法,包括底板、左边墩、右边墩、中墩、左联系梁和右联系梁;在所述左边墩和所述右边墩之间,设置所述中墩,所述中墩的左侧顶部和所述左边墩的顶部之间设置所述左联系梁,使所述中墩和所述左边墩通过所述左联系梁连接;所述中墩的右侧顶部和所述右边墩的顶部之间设置所述右联系梁,使所述中墩和所述右边墩通过所述右联系梁连接。本发明适用于河道泥沙量大、大块石多等河流泄洪洞进口结构设计,可有效处理泥沙淤积问题、防止泥沙及块石进入泄洪洞造成泄洪洞洞身结构稳定等问题,保证了泄洪洞的正常泄洪功能,同时保证结构稳定及安全。
Flood discharge tunnel inlet structure and method suitable for silt-laden and rock-laden river
一种适用于多泥沙多块石河流的泄洪洞进口结构及方法
LI KANGHONG (Autor:in) / WANG YONG (Autor:in) / LIN YISHU (Autor:in) / ZHANG HUIMIN (Autor:in) / DONG DANDAN (Autor:in) / ZHANG GUANGHUI (Autor:in) / WANG ZHILONG (Autor:in) / YANG LI (Autor:in) / ZHANG JINXING (Autor:in) / HUANG FEIYA (Autor:in)
07.05.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
The behaviour of silt-laden current
Tema Archiv | 1983
|Protecting hydro turbines in silt-laden rivers
Online Contents | 1996
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|