Railway station building steel framework glass curtain wall construction method
According to the railway station building steel framework glass curtain wall construction method, a curtain wall steel framework is welded on the ground in advance and cut into unit keels, then the unit keels are assembled on the wall face, the appearance quality of a station building curtain wall is ensured, meanwhile, measurement errors are reduced, the installation accuracy is improved, the construction period is shortened, and the cost is reduced. The main keels and the secondary keels are assembled in advance on the ground of a construction site according to a drawing and welded to form a curtain wall steel framework; secondary keels of the curtain wall steel skeleton are cut off according to the drawing, so that the curtain wall steel skeleton forms a plurality of unit skeletons; each unit framework is hoisted on a construction wall surface to be installed and fixed; the adjacent unit frameworks are connected into a whole through the transverse keels after the distance between the adjacent unit frameworks is adjusted, and the curtain wall steel framework is formed again. And the glass curtain wall is mounted on the curtain wall steel framework.
本发明要解决的技术问题是提供一种铁路站房钢骨架玻璃幕墙施工方法在地面上提前焊接幕墙钢骨架并切割成单元龙骨,然后在墙面进行组装,在确保站房幕墙观感质量同时,减少测量误差提高安装的准确性和缩短工期减少成本。在施工场地的地面按照图纸提前组拼主龙骨和次龙骨并焊接形成幕墙钢骨架;按照图纸将幕墙钢骨架的次龙骨切割断使幕墙钢骨架形成多个单元骨架;将各个单元骨架吊装在施工墙面上进行安装固定;相邻的单元骨架之间调整间距后通过横向龙骨进行连接为一体重新形成幕墙钢骨架;将玻璃幕墙安装在幕墙钢骨架上。
Railway station building steel framework glass curtain wall construction method
According to the railway station building steel framework glass curtain wall construction method, a curtain wall steel framework is welded on the ground in advance and cut into unit keels, then the unit keels are assembled on the wall face, the appearance quality of a station building curtain wall is ensured, meanwhile, measurement errors are reduced, the installation accuracy is improved, the construction period is shortened, and the cost is reduced. The main keels and the secondary keels are assembled in advance on the ground of a construction site according to a drawing and welded to form a curtain wall steel framework; secondary keels of the curtain wall steel skeleton are cut off according to the drawing, so that the curtain wall steel skeleton forms a plurality of unit skeletons; each unit framework is hoisted on a construction wall surface to be installed and fixed; the adjacent unit frameworks are connected into a whole through the transverse keels after the distance between the adjacent unit frameworks is adjusted, and the curtain wall steel framework is formed again. And the glass curtain wall is mounted on the curtain wall steel framework.
本发明要解决的技术问题是提供一种铁路站房钢骨架玻璃幕墙施工方法在地面上提前焊接幕墙钢骨架并切割成单元龙骨,然后在墙面进行组装,在确保站房幕墙观感质量同时,减少测量误差提高安装的准确性和缩短工期减少成本。在施工场地的地面按照图纸提前组拼主龙骨和次龙骨并焊接形成幕墙钢骨架;按照图纸将幕墙钢骨架的次龙骨切割断使幕墙钢骨架形成多个单元骨架;将各个单元骨架吊装在施工墙面上进行安装固定;相邻的单元骨架之间调整间距后通过横向龙骨进行连接为一体重新形成幕墙钢骨架;将玻璃幕墙安装在幕墙钢骨架上。
Railway station building steel framework glass curtain wall construction method
一种铁路站房钢骨架玻璃幕墙施工方法
ZHAO ZHONGYUN (Autor:in) / ZHANG CHUANLING (Autor:in) / FENG ZIZHE (Autor:in) / LYU JIE (Autor:in) / ZHANG XUPENG (Autor:in) / WANG SHUZHEN (Autor:in) / ZHANG CHENYUN (Autor:in) / ZHANG JIWEN (Autor:in)
07.05.2024
Patent
Elektronische Ressource
Chinesisch
Building curtain wall glass and steel fixing structure for curtain wall
Europäisches Patentamt | 2024
|Building glass curtain wall and construction method thereof
Europäisches Patentamt | 2021
|Glass curtain wall construction method and glass curtain wall structure
Europäisches Patentamt | 2023
|Steel curtain wall and steel curtain wall construction method
Europäisches Patentamt | 2018
|