Plant building construction process based on plant building machine
The invention discloses a factory building construction process based on a factory building machine, and relates to a building construction technology. Comprising the steps of plant foundation construction, pit construction, plant cushion floor construction, plant building machine installation operation, plant building machine platform jacking, plant large roof construction, plant airflow cover construction, plant building machine platform descending and roof formwork removal, and plant building machine moving to the designated position of the next construction section. Repeating the operation of the step 5 to the step 9 and the total eleven operation steps of dismantling the workshop building machine to complete the building construction operation of the workshop. The workshop building machine replaces a traditional steel pipe formwork to serve as a construction supporting system, circulation construction is achieved, the problems that a traditional steel pipe scaffold is tedious in building step, slow in procedure insertion and poor in formwork safety are solved, the workshop construction cost is saved, and meanwhile the construction period is effectively shortened.
本发明公开了一种基于厂房建造机的厂房建造施工工艺,涉及建筑施工技术,包括厂房基础施工、窖池施工、厂房垫层地板施工、厂房建造机安装作业、厂房建造机平台顶升、厂房大屋面施工、厂房气流盖施工、厂房建造机平台下降及屋面拆模、移动厂房建造机至下一施工段指定位置、重复上述步骤五至步骤九的操作和拆除厂房建造机的总计十一个操作步骤,完成厂房的建造施工作业。本发明通过厂房建造机代替传统钢管模架作为施工支撑体系,实现周转循环施工,解决传统钢管脚手架搭设步骤繁琐、工序穿插慢、模架安全性差的问题,节约厂房施工成本的同时,有效缩短施工周期。
Plant building construction process based on plant building machine
The invention discloses a factory building construction process based on a factory building machine, and relates to a building construction technology. Comprising the steps of plant foundation construction, pit construction, plant cushion floor construction, plant building machine installation operation, plant building machine platform jacking, plant large roof construction, plant airflow cover construction, plant building machine platform descending and roof formwork removal, and plant building machine moving to the designated position of the next construction section. Repeating the operation of the step 5 to the step 9 and the total eleven operation steps of dismantling the workshop building machine to complete the building construction operation of the workshop. The workshop building machine replaces a traditional steel pipe formwork to serve as a construction supporting system, circulation construction is achieved, the problems that a traditional steel pipe scaffold is tedious in building step, slow in procedure insertion and poor in formwork safety are solved, the workshop construction cost is saved, and meanwhile the construction period is effectively shortened.
本发明公开了一种基于厂房建造机的厂房建造施工工艺,涉及建筑施工技术,包括厂房基础施工、窖池施工、厂房垫层地板施工、厂房建造机安装作业、厂房建造机平台顶升、厂房大屋面施工、厂房气流盖施工、厂房建造机平台下降及屋面拆模、移动厂房建造机至下一施工段指定位置、重复上述步骤五至步骤九的操作和拆除厂房建造机的总计十一个操作步骤,完成厂房的建造施工作业。本发明通过厂房建造机代替传统钢管模架作为施工支撑体系,实现周转循环施工,解决传统钢管脚手架搭设步骤繁琐、工序穿插慢、模架安全性差的问题,节约厂房施工成本的同时,有效缩短施工周期。
Plant building construction process based on plant building machine
一种基于厂房建造机的厂房建造施工工艺
LUO JIE (Autor:in) / XIA JIANPING (Autor:in) / LONG HAIWEI (Autor:in) / REN RUI (Autor:in) / FAN XINGSHENG (Autor:in) / XU DUNYUE (Autor:in) / YANG YANHUI (Autor:in) / WANG WEI (Autor:in) / WU SHUANGLIN (Autor:in)
07.05.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction method of assembly type plant building machine matching system of concrete plant
Europäisches Patentamt | 2024
|Reorganizing a machine building and process plant engineering company
British Library Online Contents | 2003
|Engineering Index Backfile | 1945
|A concrete plant for rapid building construction
Engineering Index Backfile | 1909
Construction plant-layout for a concrete building
Engineering Index Backfile | 1911