Breakwater laid by accropode and construction method
The invention discloses an accropode laid breakwater and a construction method, the breakwater comprises a dam base body, a continuous laying area and a non-continuous laying area, the dam base body extends along a coastline and is provided with an inclined dam surface facing a water area; the concrete accropode in the continuous laying area is laid near the lower edge of the inclined breakwater face in a full distribution mode and extends in the direction of the breakwater. And geopolymer accropode in the discontinuous laying area is laid on the inclined breakwater face in a non-full-distribution mode and extends in the direction of the breakwater, and the continuous laying area is connected with the discontinuous laying area to form a protection structure covering the dam base body. Wherein the geopolymer accropode is prepared on site by taking dredged mud as a raw material, the structure forms a continuous protection structure covering the surface of the breakwater, and the continuous protection structure has the characteristics of environmental protection, energy conservation and convenience in construction, can effectively carry out wave erosion wave prevention and protection, and is suitable for island and port engineering construction occasions.
本发明公开了一种扭王字块铺设的防波堤及建造方法,防波堤包括:堤坝基体、连续铺设区域和非连续铺设区域,堤坝基体沿着海岸线延伸并建造有朝向水域的斜向堤面,连续铺设区域的混凝土扭王字块以满布形式铺设于所述斜向堤面的下沿附近并沿着防波堤走向延伸;以及非连续铺设区域的地聚物扭王字块以非满布形式铺设于所述斜向堤面并沿着防波堤走向延伸,所述连续铺设区域与非连续铺设区域连接,构成覆盖堤坝基体的防护结构。其中的地聚物扭王字块以疏浚泥为原材料就地制备,上述结构构成构成覆盖在防波堤表面的连续防护结构,具有环保节能、施工方便的特点,能够有效进行海浪侵蚀防浪防护,适用于海岛和港口工程建造场合。
Breakwater laid by accropode and construction method
The invention discloses an accropode laid breakwater and a construction method, the breakwater comprises a dam base body, a continuous laying area and a non-continuous laying area, the dam base body extends along a coastline and is provided with an inclined dam surface facing a water area; the concrete accropode in the continuous laying area is laid near the lower edge of the inclined breakwater face in a full distribution mode and extends in the direction of the breakwater. And geopolymer accropode in the discontinuous laying area is laid on the inclined breakwater face in a non-full-distribution mode and extends in the direction of the breakwater, and the continuous laying area is connected with the discontinuous laying area to form a protection structure covering the dam base body. Wherein the geopolymer accropode is prepared on site by taking dredged mud as a raw material, the structure forms a continuous protection structure covering the surface of the breakwater, and the continuous protection structure has the characteristics of environmental protection, energy conservation and convenience in construction, can effectively carry out wave erosion wave prevention and protection, and is suitable for island and port engineering construction occasions.
本发明公开了一种扭王字块铺设的防波堤及建造方法,防波堤包括:堤坝基体、连续铺设区域和非连续铺设区域,堤坝基体沿着海岸线延伸并建造有朝向水域的斜向堤面,连续铺设区域的混凝土扭王字块以满布形式铺设于所述斜向堤面的下沿附近并沿着防波堤走向延伸;以及非连续铺设区域的地聚物扭王字块以非满布形式铺设于所述斜向堤面并沿着防波堤走向延伸,所述连续铺设区域与非连续铺设区域连接,构成覆盖堤坝基体的防护结构。其中的地聚物扭王字块以疏浚泥为原材料就地制备,上述结构构成构成覆盖在防波堤表面的连续防护结构,具有环保节能、施工方便的特点,能够有效进行海浪侵蚀防浪防护,适用于海岛和港口工程建造场合。
Breakwater laid by accropode and construction method
一种扭王字块铺设的防波堤及建造方法
ZHONG WEILIANG (Autor:in) / ZHAO QIUJIN (Autor:in) / ZHANG BO (Autor:in) / FAN LIFENG (Autor:in) / DING DEKUN (Autor:in) / PEI RUI (Autor:in) / WU YAFEI (Autor:in)
10.05.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
Rundown velocity along the slope of a breakwater with an accropode cover layer
British Library Conference Proceedings | 1993
|Close-packed accropode reinforcing structure and construction method thereof
Europäisches Patentamt | 2022
|RECHERCHE ET INNOVATION - The Accropode (R) clamp.
Online Contents | 2007
|Method for preparing geopolymer accropode by using local materials
Europäisches Patentamt | 2024
|