Equipment foundation embedding device and construction method thereof
The invention relates to an equipment foundation embedding device which comprises a bottom plate. The top plate is mounted on the upper side of the bottom plate, and the top plate and the bottom plate are arranged in parallel; the plurality of fixing columns are supported between the bottom plate and the top plate; the two groups of extension rods are respectively arranged on two opposite side walls of the bottom plate; the supporting legs are arranged on the lower side of the extension rod, and the supporting legs are perpendicular to the extension rod; and the plurality of groups of barbs are respectively arranged on the plurality of supporting legs. According to the equipment foundation pre-burying device, by installing the supporting feet and the barbs, under the matching between the supporting feet and the barbs and soil, the stability performance of the bottom plate is improved, the situation that when concrete is irrigated, flowing concrete drives the bottom plate to move, and consequently the overall position deviation occurs is avoided, and meanwhile the stability of the device during burying is improved.
本发明涉及一种设备基础预埋装置,包括:底板;顶板,顶板安装在底板上侧,顶板与底板平行设置;多个固定柱,多个固定柱支撑在底板和顶板之间;两组延长杆,两组延长杆分别设置于底板相对的两个侧壁上;多个支脚,多个支脚设置在延长杆的下侧,支脚与延长杆垂直设置;多组倒钩,多组倒钩分别设置在多个支脚上。本发明一种设备基础预埋装置中,通过安装支脚和倒钩,在支脚和倒钩与泥土之间的契合下,增加底板的稳定性能,避免在灌溉混凝土时,流动的混凝土带动底板移动导致整体出现位置偏差的情况发生,同时提高该装置在掩埋时的稳定性。
Equipment foundation embedding device and construction method thereof
The invention relates to an equipment foundation embedding device which comprises a bottom plate. The top plate is mounted on the upper side of the bottom plate, and the top plate and the bottom plate are arranged in parallel; the plurality of fixing columns are supported between the bottom plate and the top plate; the two groups of extension rods are respectively arranged on two opposite side walls of the bottom plate; the supporting legs are arranged on the lower side of the extension rod, and the supporting legs are perpendicular to the extension rod; and the plurality of groups of barbs are respectively arranged on the plurality of supporting legs. According to the equipment foundation pre-burying device, by installing the supporting feet and the barbs, under the matching between the supporting feet and the barbs and soil, the stability performance of the bottom plate is improved, the situation that when concrete is irrigated, flowing concrete drives the bottom plate to move, and consequently the overall position deviation occurs is avoided, and meanwhile the stability of the device during burying is improved.
本发明涉及一种设备基础预埋装置,包括:底板;顶板,顶板安装在底板上侧,顶板与底板平行设置;多个固定柱,多个固定柱支撑在底板和顶板之间;两组延长杆,两组延长杆分别设置于底板相对的两个侧壁上;多个支脚,多个支脚设置在延长杆的下侧,支脚与延长杆垂直设置;多组倒钩,多组倒钩分别设置在多个支脚上。本发明一种设备基础预埋装置中,通过安装支脚和倒钩,在支脚和倒钩与泥土之间的契合下,增加底板的稳定性能,避免在灌溉混凝土时,流动的混凝土带动底板移动导致整体出现位置偏差的情况发生,同时提高该装置在掩埋时的稳定性。
Equipment foundation embedding device and construction method thereof
一种设备基础预埋装置及其施工方法
YANG JIE (Autor:in) / ZHAO RUI (Autor:in) / WANG LI (Autor:in) / WANG DUO (Autor:in) / FAN ZHIQIANG (Autor:in) / LIU JINXIN (Autor:in) / HAN JIANFENG (Autor:in)
10.05.2024
Patent
Elektronische Ressource
Chinesisch
Foundation bolt pre-embedding positioning device and construction method thereof
Europäisches Patentamt | 2022
|Greenhouse foundation pile embedding construction method
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2021
|Steel structure foundation bolt pre-embedding construction method
Europäisches Patentamt | 2020
|