Construction method of steel caisson type shoreside pump house
The invention discloses a construction method of a steel caisson type shoreside pump house. The construction method comprises the following steps that a foundation bed is excavated underwater at the designed position of the pump house; the method comprises the following steps: prefabricating an overwater operation platform with a hollow middle by using steel buoyancy tanks The steel caisson is hoisted to the middle of the overwater operation platform; the side wall of the steel caisson is heightened at the upper part of the steel caisson; pump room bottom plate steel bars are bound in the box body, and bottom plate concrete and high wall plate guide wall concrete are poured; then the side wall of the steel box body is heightened to the designed height, then pump house side wall concrete is poured, and after a foundation is completed, the box body is transported to the designed position of the pump house in a floating mode and located; water is evenly injected into the box body, bottom sitting of the box body is completed, and then the box body is leveled; the wall of the high pump room is continuously connected to the box body, and the internal structure of the pump room is continuously constructed; and an upper structure and a subsequent structure of the pump house are constructed. According to the construction method of the steel caisson type shoreside pump house, the steel caisson serves as a construction cofferdam and a structural body concrete pouring formwork, a strong correlation effect is generated between the steel caisson and the structural body part, a traditional construction cofferdam is omitted, and the influence on flood discharge and navigation of an existing river channel can be reduced.
本发明公开了一种钢沉箱型式岸边泵房施工方法,包括以下步骤:在泵房设计位置的水下开挖基床;利用钢浮箱预制中间镂空的水上作业平台;将钢沉箱吊装至水上作业平台中间;在钢沉箱上部接高钢沉箱侧壁;在箱体内绑扎泵房底板钢筋,浇筑底板混凝土以及高墙板导墙混凝土;再接高钢箱体侧壁至设计高度,随后浇筑泵房侧墙混凝土,待基础完成后将箱体浮运至泵房设计位置,并进行定位;在箱体内均匀注水,完成箱体坐底,再将箱体整平;继续在箱体上接高泵房墙壁,继续进行泵房内部结构施工;进行泵房的上部结构和后续结构的施工。本发明公开的一种钢沉箱型式岸边泵房施工方法,钢沉箱兼做施工围堰和结构本体混凝土浇筑模板,与结构本体部分产生较强关联作用,且取消传统施工围堰,能够减小对现有河道行洪通航影响。
Construction method of steel caisson type shoreside pump house
The invention discloses a construction method of a steel caisson type shoreside pump house. The construction method comprises the following steps that a foundation bed is excavated underwater at the designed position of the pump house; the method comprises the following steps: prefabricating an overwater operation platform with a hollow middle by using steel buoyancy tanks The steel caisson is hoisted to the middle of the overwater operation platform; the side wall of the steel caisson is heightened at the upper part of the steel caisson; pump room bottom plate steel bars are bound in the box body, and bottom plate concrete and high wall plate guide wall concrete are poured; then the side wall of the steel box body is heightened to the designed height, then pump house side wall concrete is poured, and after a foundation is completed, the box body is transported to the designed position of the pump house in a floating mode and located; water is evenly injected into the box body, bottom sitting of the box body is completed, and then the box body is leveled; the wall of the high pump room is continuously connected to the box body, and the internal structure of the pump room is continuously constructed; and an upper structure and a subsequent structure of the pump house are constructed. According to the construction method of the steel caisson type shoreside pump house, the steel caisson serves as a construction cofferdam and a structural body concrete pouring formwork, a strong correlation effect is generated between the steel caisson and the structural body part, a traditional construction cofferdam is omitted, and the influence on flood discharge and navigation of an existing river channel can be reduced.
本发明公开了一种钢沉箱型式岸边泵房施工方法,包括以下步骤:在泵房设计位置的水下开挖基床;利用钢浮箱预制中间镂空的水上作业平台;将钢沉箱吊装至水上作业平台中间;在钢沉箱上部接高钢沉箱侧壁;在箱体内绑扎泵房底板钢筋,浇筑底板混凝土以及高墙板导墙混凝土;再接高钢箱体侧壁至设计高度,随后浇筑泵房侧墙混凝土,待基础完成后将箱体浮运至泵房设计位置,并进行定位;在箱体内均匀注水,完成箱体坐底,再将箱体整平;继续在箱体上接高泵房墙壁,继续进行泵房内部结构施工;进行泵房的上部结构和后续结构的施工。本发明公开的一种钢沉箱型式岸边泵房施工方法,钢沉箱兼做施工围堰和结构本体混凝土浇筑模板,与结构本体部分产生较强关联作用,且取消传统施工围堰,能够减小对现有河道行洪通航影响。
Construction method of steel caisson type shoreside pump house
一种钢沉箱型式岸边泵房施工方法
SHU JIAQING (Autor:in) / SUN YIFAN (Autor:in) / GU XIAOQING (Autor:in) / LI LINHAO (Autor:in) / YANG QI (Autor:in) / SUN LIANGCHEN (Autor:in) / WANG DONG (Autor:in) / ZHANG BIN (Autor:in) / ZHANG TAO (Autor:in) / ZHANG RUOHUA (Autor:in)
10.05.2024
Patent
Elektronische Ressource
Chinesisch
Shoreside garbage salvage ship and shoreside garbage salvage system
Europäisches Patentamt | 2024
|Shoreside energy-saving underground water taking pump room
Europäisches Patentamt | 2024
|Shoreside-type multi-water-level combined water intake structure
Europäisches Patentamt | 2021
|