Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Device for preventing underground water recharge gas phase blockage and construction method thereof
The invention relates to the technical field of underground water, and discloses a device for preventing underground water recharge gas phase blockage and a construction method thereof. The recharge assembly comprises a recharge well and a cover body, wherein the top of the recharge well is provided with a cover body; the water conveying pipe is arranged on the inner side of the recharge well; the outer side wall of the water conveying pipe is sleeved with the filtering sleeve; the sealing cover is arranged on the outer side of the water conveying pipe; according to the device for preventing underground water recharge gas phase blockage and the construction method thereof, a second motor is started to drive a second lead screw to rotate, so that an adjusting plate is driven to ascend, a water conveying pipe at the bottom of the adjusting plate is driven to ascend, meanwhile, a telescopic hose arranged on one side of the adjusting plate is driven to ascend, and a spray head is exposed; water is injected into the pipe body and sprayed to the outer wall of the water conveying pipe through a spray head, meanwhile, a third motor is started to drive the water conveying pipe to rotate, in this way, the water conveying pipe can conduct flushing while rotating, the workload of operators is reduced, and cleaning is faster.
本发明涉及地下水技术领域,且公开了一种防止地下水回灌气相堵塞装置及其施工方法,包括回灌组件;所述回灌组件包括:回灌井其顶部设置有盖体;输水管设置于所述回灌井的内侧;过滤套筒套设于所述输水管的外侧壁;密封盖设置于所述输水管的外侧;该防止地下水回灌气相堵塞装置及其施工方法,通过启动电机二使其带动丝杆二进行转动,从而带动调节板上升,在带动调节板底部的输水管上升的同时还会带动调节板一侧设置的伸缩软管上升,将喷头漏出来,上升完成后,在管体的内部注水通过喷头将水喷洒到输水管的外壁,同时启动电机三使其带动输水管进行转动,这样输水管会边转动边冲洗,该装置减少了操作人员的工作量,使得清洗更加的快速。
Device for preventing underground water recharge gas phase blockage and construction method thereof
The invention relates to the technical field of underground water, and discloses a device for preventing underground water recharge gas phase blockage and a construction method thereof. The recharge assembly comprises a recharge well and a cover body, wherein the top of the recharge well is provided with a cover body; the water conveying pipe is arranged on the inner side of the recharge well; the outer side wall of the water conveying pipe is sleeved with the filtering sleeve; the sealing cover is arranged on the outer side of the water conveying pipe; according to the device for preventing underground water recharge gas phase blockage and the construction method thereof, a second motor is started to drive a second lead screw to rotate, so that an adjusting plate is driven to ascend, a water conveying pipe at the bottom of the adjusting plate is driven to ascend, meanwhile, a telescopic hose arranged on one side of the adjusting plate is driven to ascend, and a spray head is exposed; water is injected into the pipe body and sprayed to the outer wall of the water conveying pipe through a spray head, meanwhile, a third motor is started to drive the water conveying pipe to rotate, in this way, the water conveying pipe can conduct flushing while rotating, the workload of operators is reduced, and cleaning is faster.
本发明涉及地下水技术领域,且公开了一种防止地下水回灌气相堵塞装置及其施工方法,包括回灌组件;所述回灌组件包括:回灌井其顶部设置有盖体;输水管设置于所述回灌井的内侧;过滤套筒套设于所述输水管的外侧壁;密封盖设置于所述输水管的外侧;该防止地下水回灌气相堵塞装置及其施工方法,通过启动电机二使其带动丝杆二进行转动,从而带动调节板上升,在带动调节板底部的输水管上升的同时还会带动调节板一侧设置的伸缩软管上升,将喷头漏出来,上升完成后,在管体的内部注水通过喷头将水喷洒到输水管的外壁,同时启动电机三使其带动输水管进行转动,这样输水管会边转动边冲洗,该装置减少了操作人员的工作量,使得清洗更加的快速。
Device for preventing underground water recharge gas phase blockage and construction method thereof
一种防止地下水回灌气相堵塞装置及其施工方法
LI XINWANG (Autor:in) / FU YINHUAN (Autor:in) / MA SUYING (Autor:in) / WEI SA (Autor:in) / ZHANG SHUANG (Autor:in) / ZHANG WEI (Autor:in) / CHEN XING (Autor:in) / MA YANBAO (Autor:in) / YANG ZITING (Autor:in)
24.05.2024
Patent
Elektronische Ressource
Chinesisch
Underground water recharge treatment system, construction method and mine water recharge method
Europäisches Patentamt | 2020
|Underground water recharge device and use method thereof
Europäisches Patentamt | 2023
|Tunnel underground river water burst blockage construction method
Europäisches Patentamt | 2015
|Underground water multi-layer high-pressure recharge system and construction method thereof
Europäisches Patentamt | 2022
|Novel underground water recharge structure and construction process
Europäisches Patentamt | 2020
|