Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of triangular debris flow anti-impact blocking device
The invention discloses a construction method of a triangular debris flow anti-impact blocking device, and belongs to the technical field of debris flow protection. The construction method comprises the following steps that S1, a foundation pit is excavated, and drilling is conducted; s2, concrete piles are poured, and connecting beams and inclined supports are constructed; s3, filling stones; and S4, subsequent inspection and maintenance. According to the construction method of the triangular debris flow anti-impact blocking device, construction is easy, the efficiency is high, the construction period is short, a stable triangular structure is formed through the concrete piles and the connecting beams, the inclined supports are installed, the anti-impact capacity of the blocking device is enhanced, stability is good, installation and maintenance are easy, and when debris flow disasters happen, the blocking device is safe and reliable. Stone and silt in debris flow can be effectively blocked, water flow is discharged, and the safety of a downstream area is protected.
本发明公开了一种三角形泥石流抗冲击拦挡装置的施工方法,属于泥石流防护技术领域,包括以下步骤:S1、基坑开挖、钻孔;S2、浇筑混凝土桩并施工连系梁及斜支撑;S3、填充石料;S4、后续检查维护。本发明一种三角形泥石流抗冲击拦挡装置的施工方法,施工简单,效率高,工期短,且通过混凝土桩与连系梁构成一个稳定的三角形结构,安装斜支撑,增强了拦挡装置的抗冲击能力,且稳定性好,易于安装和维护,在泥石流灾害发生时,能够有效地拦挡泥石流中的石块和泥沙,排泄水流,保护下游地区的安全。
Construction method of triangular debris flow anti-impact blocking device
The invention discloses a construction method of a triangular debris flow anti-impact blocking device, and belongs to the technical field of debris flow protection. The construction method comprises the following steps that S1, a foundation pit is excavated, and drilling is conducted; s2, concrete piles are poured, and connecting beams and inclined supports are constructed; s3, filling stones; and S4, subsequent inspection and maintenance. According to the construction method of the triangular debris flow anti-impact blocking device, construction is easy, the efficiency is high, the construction period is short, a stable triangular structure is formed through the concrete piles and the connecting beams, the inclined supports are installed, the anti-impact capacity of the blocking device is enhanced, stability is good, installation and maintenance are easy, and when debris flow disasters happen, the blocking device is safe and reliable. Stone and silt in debris flow can be effectively blocked, water flow is discharged, and the safety of a downstream area is protected.
本发明公开了一种三角形泥石流抗冲击拦挡装置的施工方法,属于泥石流防护技术领域,包括以下步骤:S1、基坑开挖、钻孔;S2、浇筑混凝土桩并施工连系梁及斜支撑;S3、填充石料;S4、后续检查维护。本发明一种三角形泥石流抗冲击拦挡装置的施工方法,施工简单,效率高,工期短,且通过混凝土桩与连系梁构成一个稳定的三角形结构,安装斜支撑,增强了拦挡装置的抗冲击能力,且稳定性好,易于安装和维护,在泥石流灾害发生时,能够有效地拦挡泥石流中的石块和泥沙,排泄水流,保护下游地区的安全。
Construction method of triangular debris flow anti-impact blocking device
一种三角形泥石流抗冲击拦挡装置的施工方法
WEI XUELI (Autor:in) / XU HANWEN (Autor:in) / XIAN YU (Autor:in) / SHI XINGWU (Autor:in) / LIU ENLONG (Autor:in) / QI YUNLONG (Autor:in)
28.05.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E02D
FOUNDATIONS
,
Gründungen
Lifting debris flow blocking structure and construction method
Europäisches Patentamt | 2024
|Economical debris flow blocking dam structure and construction method thereof
Europäisches Patentamt | 2018
|ECONOMICAL DEBRIS FLOW BLOCKING DAM STRUCTURE AND CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2017
|Flexible blocking structure for debris flow and construction method of flexible blocking structure
Europäisches Patentamt | 2024
|