Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Arc-shaped sheet pile connection construction method
The invention relates to the field of constructional engineering, and provides an arc-shaped sheet pile connection construction method which comprises the following steps that firstly, the lower end of a first sheet pile body is driven into the ground through a pile driver; secondly, a connecting and positioning auxiliary device is moved to abut against the first sheet pile body, a second sheet pile body is hoisted to abut against the connecting and positioning auxiliary device through the crane, and the crane moves the second sheet pile body under the guiding of the connecting and positioning auxiliary device; the tenon on the second sheet pile body is in butt joint with the tenon on the first sheet pile body; and thirdly, the lower end of the second sheet pile body is driven into the ground through a pile driver. According to the invention, the two sheet pile bodies can be butted quickly and accurately.
本发明涉及建筑工程领域,提供了一种弧形板桩连接施工方法,包括以下步骤:步骤一:利用打桩机把第一个板桩本体下端打入地面内;步骤二:把连接定位辅助装置移动至和第一个板桩本体相抵,利用吊机把第二个板桩本体吊至和连接定位辅助装置相抵,吊机在连接定位辅助装置的导向下移动第二个板桩本体,使第二个板桩本体上的凹榫和第一个板桩本体上的凸榫相互对接;步骤三:利用打桩机把第二个板桩本体下端打入地面内。本发明能够使两个板桩本体快速准确地进行对接。
Arc-shaped sheet pile connection construction method
The invention relates to the field of constructional engineering, and provides an arc-shaped sheet pile connection construction method which comprises the following steps that firstly, the lower end of a first sheet pile body is driven into the ground through a pile driver; secondly, a connecting and positioning auxiliary device is moved to abut against the first sheet pile body, a second sheet pile body is hoisted to abut against the connecting and positioning auxiliary device through the crane, and the crane moves the second sheet pile body under the guiding of the connecting and positioning auxiliary device; the tenon on the second sheet pile body is in butt joint with the tenon on the first sheet pile body; and thirdly, the lower end of the second sheet pile body is driven into the ground through a pile driver. According to the invention, the two sheet pile bodies can be butted quickly and accurately.
本发明涉及建筑工程领域,提供了一种弧形板桩连接施工方法,包括以下步骤:步骤一:利用打桩机把第一个板桩本体下端打入地面内;步骤二:把连接定位辅助装置移动至和第一个板桩本体相抵,利用吊机把第二个板桩本体吊至和连接定位辅助装置相抵,吊机在连接定位辅助装置的导向下移动第二个板桩本体,使第二个板桩本体上的凹榫和第一个板桩本体上的凸榫相互对接;步骤三:利用打桩机把第二个板桩本体下端打入地面内。本发明能够使两个板桩本体快速准确地进行对接。
Arc-shaped sheet pile connection construction method
一种弧形板桩连接施工方法
LIN ZHIHAO (Autor:in) / ZHANG ANYING (Autor:in) / ZENG CHUHUI (Autor:in) / DU XUEWEN (Autor:in) / PAN JIALUN (Autor:in) / JIANG XUELING (Autor:in) / LAN YIFEI (Autor:in)
28.05.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
SHEET PILE CONNECTION STRUCTURE AND SHEET PILE CONNECTION METHOD
Europäisches Patentamt | 2021
|SHEET PILE CONNECTION STRUCTURE AND SHEET PILE CONNECTION METHOD
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|