Aluminum plate installation construction method
An aluminum plate installation construction method specifically comprises the following steps that S1, surveying and setting out are conducted, specifically, keel grid division is conducted according to drawing requirements; s2, keels are installed on the wall surface according to the drawing and construction standard requirements; the four edges of the aluminum plate are folded, reinforcing ribs are fixed to the back face of the aluminum plate, and a first aluminum corner connector used for connection is welded to each folded edge of the aluminum plate; s4, the aluminum plate is transported to a site, and the aluminum plate is connected with the keel through the first aluminum corner connector, the distance between the reinforcing ribs is defined according to the length of the short edge of the aluminum plate, and meanwhile the connecting mode of the reinforcing ribs and the aluminum plate and the connecting mode of the first aluminum corner connector and the aluminum plate are adjusted, so that the connecting stability of the reinforcing ribs and the aluminum plate and the connecting stability of the first aluminum corner connector and the aluminum plate are improved; therefore, the flatness of the aluminum plate between the grids is improved, and the overall flatness of the aluminum plate meets the set requirement.
一种铝板安装施工方法,具体包括如下步骤:S1、测量放线:按图纸要求进行龙骨分格;S2、根据图纸和施工标准要求在墙面上安装龙骨;S3、铝板加工:铝板四边折边,铝板背面固定加强筋,铝板的每条折边上焊接有用于连接的第一铝角码;S4、将铝板运输到现场,通过第一铝角码将铝板与龙骨连接,本发明通过铝板短边的长度来定义加强筋的间距,同时通过调整加强筋与铝板连接方式、第一铝角码与铝板连接方式,提高加强筋和第一铝角码与铝板连接的稳定性,从而提高分格之间铝板的平整度,使得铝板整体的平整度达到设定要求。
Aluminum plate installation construction method
An aluminum plate installation construction method specifically comprises the following steps that S1, surveying and setting out are conducted, specifically, keel grid division is conducted according to drawing requirements; s2, keels are installed on the wall surface according to the drawing and construction standard requirements; the four edges of the aluminum plate are folded, reinforcing ribs are fixed to the back face of the aluminum plate, and a first aluminum corner connector used for connection is welded to each folded edge of the aluminum plate; s4, the aluminum plate is transported to a site, and the aluminum plate is connected with the keel through the first aluminum corner connector, the distance between the reinforcing ribs is defined according to the length of the short edge of the aluminum plate, and meanwhile the connecting mode of the reinforcing ribs and the aluminum plate and the connecting mode of the first aluminum corner connector and the aluminum plate are adjusted, so that the connecting stability of the reinforcing ribs and the aluminum plate and the connecting stability of the first aluminum corner connector and the aluminum plate are improved; therefore, the flatness of the aluminum plate between the grids is improved, and the overall flatness of the aluminum plate meets the set requirement.
一种铝板安装施工方法,具体包括如下步骤:S1、测量放线:按图纸要求进行龙骨分格;S2、根据图纸和施工标准要求在墙面上安装龙骨;S3、铝板加工:铝板四边折边,铝板背面固定加强筋,铝板的每条折边上焊接有用于连接的第一铝角码;S4、将铝板运输到现场,通过第一铝角码将铝板与龙骨连接,本发明通过铝板短边的长度来定义加强筋的间距,同时通过调整加强筋与铝板连接方式、第一铝角码与铝板连接方式,提高加强筋和第一铝角码与铝板连接的稳定性,从而提高分格之间铝板的平整度,使得铝板整体的平整度达到设定要求。
Aluminum plate installation construction method
一种铝板安装施工方法
MA YI (Autor:in) / ZHENG YANLAI (Autor:in) / DAI QINGQIN (Autor:in) / YI XIAO (Autor:in) / GONG ZHIPENG (Autor:in) / WU GANG (Autor:in) / TAN KA (Autor:in) / XU JIAHAO (Autor:in)
28.05.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Installation construction equipment for aluminum plate stretching net
Europäisches Patentamt | 2022
|Installation construction process of aluminum plate stretching net
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2022
|Installation construction method of building outdoor engineering aluminum plate curtain wall
Europäisches Patentamt | 2024
|Curved decorative aluminum plate installation error adjusting device and construction method
Europäisches Patentamt | 2024
|