Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete pouring wall construction equipment
The invention relates to the technical field of pile installation, in particular to concrete pouring wall construction equipment which comprises a chassis, a lifting mechanism is fixedly connected to the upper end of the chassis, a platen is fixedly connected to the upper end of the lifting mechanism, an opening is formed in the left end of the platen, and a conveying mechanism for pushing objects on the platen out of the opening is installed on the platen; a supporting frame is fixedly connected to the table plate, an x-z-axis linear driving mechanism is fixedly connected to the supporting frame, a y-axis linear driving mechanism is fixedly connected to the x-z-axis linear driving mechanism, the x-z-axis linear driving mechanism is used for driving the y-axis linear driving mechanism to horizontally move and ascend and descend, and construction parts which are arranged in a front-back mirror symmetry mode are installed on the y-axis linear driving mechanism. The y-axis linear driving mechanism is used for adjusting the distance between the two construction parts; the two construction pieces can carry the foundation piles or longitudinally extend into the foundation piles, the two stacked foundation piles are fixed through nails, and the pile installation efficiency is improved.
本发明涉桩的安装技术领域,更具体的说是一种混凝土浇筑墙施工设备,包括底盘,底盘的上端固接有升降机构,升降机构的上端固接有台板,台板的左端设置有开口,台板上安装有将台板上的物体推出开口的传送机构;台板上固接有支撑架,支撑架上固接有xz轴直线驱动机构,xz轴直线驱动机构上固接有y轴直线驱动机构,xz轴直线驱动机构用于驱动y轴直线驱动机构左右平移和升降,y轴直线驱动机构上安装有前后镜像对称设置的施工件,y轴直线驱动机构用于调节两个施工件的间距;两个施工件可以携带基础桩,或纵向伸入基础桩,将两个堆叠的基础桩通过钉固定,提高桩的安装效率。
Concrete pouring wall construction equipment
The invention relates to the technical field of pile installation, in particular to concrete pouring wall construction equipment which comprises a chassis, a lifting mechanism is fixedly connected to the upper end of the chassis, a platen is fixedly connected to the upper end of the lifting mechanism, an opening is formed in the left end of the platen, and a conveying mechanism for pushing objects on the platen out of the opening is installed on the platen; a supporting frame is fixedly connected to the table plate, an x-z-axis linear driving mechanism is fixedly connected to the supporting frame, a y-axis linear driving mechanism is fixedly connected to the x-z-axis linear driving mechanism, the x-z-axis linear driving mechanism is used for driving the y-axis linear driving mechanism to horizontally move and ascend and descend, and construction parts which are arranged in a front-back mirror symmetry mode are installed on the y-axis linear driving mechanism. The y-axis linear driving mechanism is used for adjusting the distance between the two construction parts; the two construction pieces can carry the foundation piles or longitudinally extend into the foundation piles, the two stacked foundation piles are fixed through nails, and the pile installation efficiency is improved.
本发明涉桩的安装技术领域,更具体的说是一种混凝土浇筑墙施工设备,包括底盘,底盘的上端固接有升降机构,升降机构的上端固接有台板,台板的左端设置有开口,台板上安装有将台板上的物体推出开口的传送机构;台板上固接有支撑架,支撑架上固接有xz轴直线驱动机构,xz轴直线驱动机构上固接有y轴直线驱动机构,xz轴直线驱动机构用于驱动y轴直线驱动机构左右平移和升降,y轴直线驱动机构上安装有前后镜像对称设置的施工件,y轴直线驱动机构用于调节两个施工件的间距;两个施工件可以携带基础桩,或纵向伸入基础桩,将两个堆叠的基础桩通过钉固定,提高桩的安装效率。
Concrete pouring wall construction equipment
一种混凝土浇筑墙施工设备
WANG QIONG (Autor:in)
31.05.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Base pouring equipment for concrete core wall construction
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Wall body concrete pouring wall formwork construction method
Europäisches Patentamt | 2020
|