Foundation pit fender post construction method
The invention relates to the technical field of underground engineering construction, in particular to a foundation pit fender post construction method which comprises the steps that excavation construction is conducted on a preset construction site to form a construction groove with a first preset depth, then drilling equipment with a second preset height is installed in the construction groove, drilling construction is conducted through the drilling equipment, and a foundation pit fender post is constructed. And finally, steel reinforcement cages are installed in the current hole in a segmented mode according to the sequence from bottom to top, concrete pouring is conducted, so that the foundation pit fender post is formed, drilling pile construction can be conducted in a narrow area when the foundation pit fender post is used, the construction process is not affected by the construction environment, and normal construction of the drilling pile is achieved.
本发明涉及地下工程施工技术领域,特别涉及一种基坑围护桩施工方法,通过在预设施工场地,进行开挖施工,以形成具有第一预设深度的施工槽,然后在施工槽内安装具有第二预设高度的钻孔设备,并使用钻孔设备进行钻孔施工,形成当前孔洞,最后在当前孔洞内按照自下而上的顺序分段安装钢筋笼并进行混凝土浇筑,以形成基坑围护桩,使得本发明在使用时可以在狭窄区域进行钻孔桩施工,施工过程不会受到施工环境的影响,实现了对钻孔桩的正常施工。
Foundation pit fender post construction method
The invention relates to the technical field of underground engineering construction, in particular to a foundation pit fender post construction method which comprises the steps that excavation construction is conducted on a preset construction site to form a construction groove with a first preset depth, then drilling equipment with a second preset height is installed in the construction groove, drilling construction is conducted through the drilling equipment, and a foundation pit fender post is constructed. And finally, steel reinforcement cages are installed in the current hole in a segmented mode according to the sequence from bottom to top, concrete pouring is conducted, so that the foundation pit fender post is formed, drilling pile construction can be conducted in a narrow area when the foundation pit fender post is used, the construction process is not affected by the construction environment, and normal construction of the drilling pile is achieved.
本发明涉及地下工程施工技术领域,特别涉及一种基坑围护桩施工方法,通过在预设施工场地,进行开挖施工,以形成具有第一预设深度的施工槽,然后在施工槽内安装具有第二预设高度的钻孔设备,并使用钻孔设备进行钻孔施工,形成当前孔洞,最后在当前孔洞内按照自下而上的顺序分段安装钢筋笼并进行混凝土浇筑,以形成基坑围护桩,使得本发明在使用时可以在狭窄区域进行钻孔桩施工,施工过程不会受到施工环境的影响,实现了对钻孔桩的正常施工。
Foundation pit fender post construction method
基坑围护桩施工方法
HOU JIANPING (Autor:in) / CHEN JIANLIN (Autor:in) / SHI GANGMIN (Autor:in) / MA WU (Autor:in) / CAO DONGYANG (Autor:in) / HE TAO (Autor:in) / PU BAIWU (Autor:in)
07.06.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Deep foundation pit fender post structure and construction method
Europäisches Patentamt | 2023
|Variable-stiffness foundation pit fender post and construction method
Europäisches Patentamt | 2024
|Large-diameter foundation pit fender post and construction technology thereof
Europäisches Patentamt | 2022
|