The invention discloses a municipal road inspection well anti-sedimentation structure and a construction method.The municipal road inspection well anti-sedimentation structure comprises a module brick shaft, the outer side of the module brick shaft is coated with a plain concrete backfill area, and a reinforced concrete well ring is poured at the top of the module brick shaft; the same reinforced concrete pressure-bearing well ring is arranged at the top of the plain concrete backfill area reinforced concrete well ring, a bidirectional glass fiber grating is arranged at the top of the reinforced concrete pressure-bearing well ring, and the outer side of the plain concrete backfill area and the outer side of the reinforced concrete pressure-bearing well ring are wrapped with a lime soil subbase layer and a water stabilizing base layer respectively. By controlling backfilling around the well, optimizing the anti-sedimentation structure of the inspection well and arranging the adjustable anti-sedimentation well lid, the hidden danger of diseases such as municipal road inspection well sedimentation, well lid jumping abnormal sound and well surrounding pavement cracking is solved, and the later maintenance cost is greatly reduced under the condition that only a small amount of construction cost is increased.
本发明公开了一种市政道路检查井防沉降构造及施工方法,其一种市政道路检查井防沉降构造包括模块砖井筒,所述模块砖井筒的外侧包覆有素混凝土回填区,模块砖井筒的顶部浇筑有钢筋混凝土井圈,素混凝土回填区钢筋混凝土井圈的顶部设有同一个钢筋混凝土承压井圈,钢筋混凝土承压井圈的顶部设有双向型玻纤格栅,素混凝土回填区和钢筋混凝土承压井圈的外侧分别包覆有灰土底基层和水稳定基层,本发明通过控制井周回填、优化检查井防沉降构造及布设可调式防沉降井盖,解决市政道路检查井沉降、井盖跳动异响、井周路面开裂等病害隐患,在只增加少量的建造成本的情况下,极大减少了后期维护成本。
The invention discloses a municipal road inspection well anti-sedimentation structure and a construction method.The municipal road inspection well anti-sedimentation structure comprises a module brick shaft, the outer side of the module brick shaft is coated with a plain concrete backfill area, and a reinforced concrete well ring is poured at the top of the module brick shaft; the same reinforced concrete pressure-bearing well ring is arranged at the top of the plain concrete backfill area reinforced concrete well ring, a bidirectional glass fiber grating is arranged at the top of the reinforced concrete pressure-bearing well ring, and the outer side of the plain concrete backfill area and the outer side of the reinforced concrete pressure-bearing well ring are wrapped with a lime soil subbase layer and a water stabilizing base layer respectively. By controlling backfilling around the well, optimizing the anti-sedimentation structure of the inspection well and arranging the adjustable anti-sedimentation well lid, the hidden danger of diseases such as municipal road inspection well sedimentation, well lid jumping abnormal sound and well surrounding pavement cracking is solved, and the later maintenance cost is greatly reduced under the condition that only a small amount of construction cost is increased.
本发明公开了一种市政道路检查井防沉降构造及施工方法,其一种市政道路检查井防沉降构造包括模块砖井筒,所述模块砖井筒的外侧包覆有素混凝土回填区,模块砖井筒的顶部浇筑有钢筋混凝土井圈,素混凝土回填区钢筋混凝土井圈的顶部设有同一个钢筋混凝土承压井圈,钢筋混凝土承压井圈的顶部设有双向型玻纤格栅,素混凝土回填区和钢筋混凝土承压井圈的外侧分别包覆有灰土底基层和水稳定基层,本发明通过控制井周回填、优化检查井防沉降构造及布设可调式防沉降井盖,解决市政道路检查井沉降、井盖跳动异响、井周路面开裂等病害隐患,在只增加少量的建造成本的情况下,极大减少了后期维护成本。
Municipal road inspection well anti-sedimentation structure and construction method
一种市政道路检查井防沉降构造及施工方法
11.06.2024
Patent
Elektronische Ressource
Chinesisch
Anti-sedimentation inspection well for municipal road
Europäisches Patentamt | 2021
|Municipal road inspection well and construction method thereof
Europäisches Patentamt | 2022
|Construction method of anti-falling net structure of inspection well cover for municipal road