The invention discloses a double-layer geotechnical cloth laying construction method, and relates to the technical field of river geotechnical cloth laying, and the method comprises the following steps: 1, measuring before construction, selecting a laying area, measuring, and determining a construction base map; 2, geotextile cutting and splicing are conducted, specifically, the geotextile is cut, sewn, folded and bound; 3, transporting the geotechnical cloth, and transporting the bound geotechnical cloth roll to a to-be-laid area; 4, laying equipment is determined, the laying equipment is transformed, and the efficiency of the laying equipment is improved; 5, geotextile is laid, and laying is carried out on the laying area through laying equipment; according to the method, through a positioning system and multi-beam, RTK and single-beam multi-aspect measurement, more accurate construction can be achieved, the construction efficiency is improved while the construction quality is guaranteed, the construction process is designed according to the construction site, and the construction stability is guaranteed.
本发明公开一种双层土工布铺设施工方法,涉及河流土工布铺设技术领域,包括以下步骤:步骤一:施工前测量,选定铺设区域并进行测量,确定施工底图;步骤二:土工布裁剪及拼接,对土工布进行裁剪及缝合并折叠捆绑;步骤三:土工布运输,将所述捆绑好的土工布卷运送到待铺设区域处;步骤四:确定铺设设备,对铺设设备进行改造,使所述铺设设备效率提高;步骤五:土工布铺设,通过铺设设备带铺设区域进行铺设;步骤六:检查验收,对土工布布设完成后去区域进行检查,本发明通过定位系统及多波束、RTK和单波束多方面测量,能够实现更精准的施工,在保证施工质量的同时提高了施工效率,本发明根据施工现场进行设计施工流程,保证施工的稳定性。
The invention discloses a double-layer geotechnical cloth laying construction method, and relates to the technical field of river geotechnical cloth laying, and the method comprises the following steps: 1, measuring before construction, selecting a laying area, measuring, and determining a construction base map; 2, geotextile cutting and splicing are conducted, specifically, the geotextile is cut, sewn, folded and bound; 3, transporting the geotechnical cloth, and transporting the bound geotechnical cloth roll to a to-be-laid area; 4, laying equipment is determined, the laying equipment is transformed, and the efficiency of the laying equipment is improved; 5, geotextile is laid, and laying is carried out on the laying area through laying equipment; according to the method, through a positioning system and multi-beam, RTK and single-beam multi-aspect measurement, more accurate construction can be achieved, the construction efficiency is improved while the construction quality is guaranteed, the construction process is designed according to the construction site, and the construction stability is guaranteed.
本发明公开一种双层土工布铺设施工方法,涉及河流土工布铺设技术领域,包括以下步骤:步骤一:施工前测量,选定铺设区域并进行测量,确定施工底图;步骤二:土工布裁剪及拼接,对土工布进行裁剪及缝合并折叠捆绑;步骤三:土工布运输,将所述捆绑好的土工布卷运送到待铺设区域处;步骤四:确定铺设设备,对铺设设备进行改造,使所述铺设设备效率提高;步骤五:土工布铺设,通过铺设设备带铺设区域进行铺设;步骤六:检查验收,对土工布布设完成后去区域进行检查,本发明通过定位系统及多波束、RTK和单波束多方面测量,能够实现更精准的施工,在保证施工质量的同时提高了施工效率,本发明根据施工现场进行设计施工流程,保证施工的稳定性。
Double-layer geotextile laying construction method
一种双层土工布铺设施工方法