Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prefabricated wallboard supporting frame for constructional engineering and mounting method of prefabricated wallboard
The invention discloses a constructional engineering prefabricated wallboard supporting frame and a prefabricated wallboard installation method, and the constructional engineering prefabricated wallboard supporting frame comprises a clamping device, two laminated boards of the clamping device are attached to the two opposite sides of a prefabricated wallboard respectively, and the two opposite sides of the two laminated boards are tied together through a tying assembly; rollers are mounted on the outer edge of the base, a floor supporting plate is mounted at the bottom of the base in a liftable manner, and a plurality of guide holes are formed in the base and are vertically formed; the base is connected with a plurality of guide columns, the guide columns are arranged in the guide holes in a sliding mode, an electric jacking piece is installed on the base, and a first sliding groove is formed in the base; the moving seat is connected with a first sliding block arranged in the first sliding groove in a sliding mode, a first driving piece is installed in the first sliding groove, a second sliding groove is formed in the moving seat, and an angle is formed between the second sliding groove and the first sliding groove; and one end of the supporting arm is connected with a second sliding block arranged in the second sliding groove in a sliding mode, a second driving piece is installed in the second sliding groove, and the other end of the supporting arm is detachably installed on a locking and attaching base of the clamping device. The problems that when the prefabricated wallboard is installed, it is difficult for workers to accurately control the position of the prefabricated wallboard, and the construction efficiency is low are solved.
本发明公开了一种建筑工程预制墙板支撑架及预制墙板的安装方法,包括:夹持器,其两片叠合板分别贴合于预制墙板的相对两侧,两片叠合板的相对两侧分别通过拉结组件拉结在一起;底座,底座的外缘安装有滚轮,底座的底部可升降地安装有撑地板,底座开设有多个导向孔,导向孔竖向设置;基座,连接有多个导向柱,导向柱滑设于导向孔中,底座上安装有电动顶升件,基座开设有第一滑槽;移动座,移动座连接有滑设于第一滑槽中的第一滑块,第一滑槽中安装有第一驱动件,移动座开设有第二滑槽,第二滑槽与第一滑槽呈角度设置;支承臂,支承臂的一端连接有滑设于第二滑槽中的第二滑块,第二滑槽中安装有第二驱动件,支承臂的另一端可拆卸地安装于夹持器的锁附座上。本发明解决了预制墙板在安装时,工人精准控制预制墙板的位置困难,施工效率低的问题。
Prefabricated wallboard supporting frame for constructional engineering and mounting method of prefabricated wallboard
The invention discloses a constructional engineering prefabricated wallboard supporting frame and a prefabricated wallboard installation method, and the constructional engineering prefabricated wallboard supporting frame comprises a clamping device, two laminated boards of the clamping device are attached to the two opposite sides of a prefabricated wallboard respectively, and the two opposite sides of the two laminated boards are tied together through a tying assembly; rollers are mounted on the outer edge of the base, a floor supporting plate is mounted at the bottom of the base in a liftable manner, and a plurality of guide holes are formed in the base and are vertically formed; the base is connected with a plurality of guide columns, the guide columns are arranged in the guide holes in a sliding mode, an electric jacking piece is installed on the base, and a first sliding groove is formed in the base; the moving seat is connected with a first sliding block arranged in the first sliding groove in a sliding mode, a first driving piece is installed in the first sliding groove, a second sliding groove is formed in the moving seat, and an angle is formed between the second sliding groove and the first sliding groove; and one end of the supporting arm is connected with a second sliding block arranged in the second sliding groove in a sliding mode, a second driving piece is installed in the second sliding groove, and the other end of the supporting arm is detachably installed on a locking and attaching base of the clamping device. The problems that when the prefabricated wallboard is installed, it is difficult for workers to accurately control the position of the prefabricated wallboard, and the construction efficiency is low are solved.
本发明公开了一种建筑工程预制墙板支撑架及预制墙板的安装方法,包括:夹持器,其两片叠合板分别贴合于预制墙板的相对两侧,两片叠合板的相对两侧分别通过拉结组件拉结在一起;底座,底座的外缘安装有滚轮,底座的底部可升降地安装有撑地板,底座开设有多个导向孔,导向孔竖向设置;基座,连接有多个导向柱,导向柱滑设于导向孔中,底座上安装有电动顶升件,基座开设有第一滑槽;移动座,移动座连接有滑设于第一滑槽中的第一滑块,第一滑槽中安装有第一驱动件,移动座开设有第二滑槽,第二滑槽与第一滑槽呈角度设置;支承臂,支承臂的一端连接有滑设于第二滑槽中的第二滑块,第二滑槽中安装有第二驱动件,支承臂的另一端可拆卸地安装于夹持器的锁附座上。本发明解决了预制墙板在安装时,工人精准控制预制墙板的位置困难,施工效率低的问题。
Prefabricated wallboard supporting frame for constructional engineering and mounting method of prefabricated wallboard
建筑工程预制墙板支撑架及预制墙板的安装方法
YUN HAIFENG (Autor:in) / ZHAO ZHITAO (Autor:in) / CUI HAO (Autor:in) / LIU GUOCHUN (Autor:in) / HAO QI (Autor:in)
14.06.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Prefabricated wallboard connecting system and prefabricated wallboard
Europäisches Patentamt | 2024
|Prefabricated wallboard hoisting method and prefabricated wallboard hoisting tool
Europäisches Patentamt | 2023
|