Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction equipment for urban asphalt road
The invention belongs to the technical field of asphalt road construction, and discloses urban asphalt road construction equipment which comprises a base and a hopper fixed to the base, a discharging opening is formed in the bottom of the hopper, a center plate is arranged on one side of the base in a sliding mode, and two fixing rods are symmetrically and fixedly installed on the two sides of the base; side plates are slidably connected to the two fixing rods, scraping plates are rotatably connected between the center plate and the two side plates, a center shaft is rotatably arranged on one side of the center plate, universal couplings are fixedly connected to the two ends of the center shaft, and spiral conveying rods are fixedly connected to one ends of the two universal couplings; and the spiral directions of the two spiral conveying rods are opposite. The distance between the two side plates is changed through sliding of the center plate, and meanwhile, the flattening range of the two spiral conveying rods is controlled, so that the laying width of the construction equipment can be adjusted, and the practicability of the equipment is improved.
本发明属于沥青道路施工技术领域,本发明公开了一种城市沥青道路用施工设备,包括底座以及固定于底座上的料斗,所述料斗底部开设有出料口,所述底座一侧滑动设有中心板,所述底座两侧对称固定安装有两个固定杆,两个所述固定杆上均滑动连接有侧板,所述中心板与两个侧板之间均转动连接有刮板,所述中心板一侧转动设有中心轴,所述中心轴两端均固定连接有万向联轴器,两个所述万向联轴器的一端均固定连接有螺旋输送杆,且两个螺旋输送杆的螺旋方向相反。本发明通过中心板的滑动改变两个侧板之间的距离,同时控制两个螺旋输送杆的摊平范围,以此可调节施工设备的铺设宽度,增加设备实用性。
Construction equipment for urban asphalt road
The invention belongs to the technical field of asphalt road construction, and discloses urban asphalt road construction equipment which comprises a base and a hopper fixed to the base, a discharging opening is formed in the bottom of the hopper, a center plate is arranged on one side of the base in a sliding mode, and two fixing rods are symmetrically and fixedly installed on the two sides of the base; side plates are slidably connected to the two fixing rods, scraping plates are rotatably connected between the center plate and the two side plates, a center shaft is rotatably arranged on one side of the center plate, universal couplings are fixedly connected to the two ends of the center shaft, and spiral conveying rods are fixedly connected to one ends of the two universal couplings; and the spiral directions of the two spiral conveying rods are opposite. The distance between the two side plates is changed through sliding of the center plate, and meanwhile, the flattening range of the two spiral conveying rods is controlled, so that the laying width of the construction equipment can be adjusted, and the practicability of the equipment is improved.
本发明属于沥青道路施工技术领域,本发明公开了一种城市沥青道路用施工设备,包括底座以及固定于底座上的料斗,所述料斗底部开设有出料口,所述底座一侧滑动设有中心板,所述底座两侧对称固定安装有两个固定杆,两个所述固定杆上均滑动连接有侧板,所述中心板与两个侧板之间均转动连接有刮板,所述中心板一侧转动设有中心轴,所述中心轴两端均固定连接有万向联轴器,两个所述万向联轴器的一端均固定连接有螺旋输送杆,且两个螺旋输送杆的螺旋方向相反。本发明通过中心板的滑动改变两个侧板之间的距离,同时控制两个螺旋输送杆的摊平范围,以此可调节施工设备的铺设宽度,增加设备实用性。
Construction equipment for urban asphalt road
一种城市沥青道路用施工设备
JIANG RONGBIN (Autor:in) / ZHANG QI (Autor:in)
18.06.2024
Patent
Elektronische Ressource
Chinesisch
Road construction corner asphalt collecting equipment
Europäisches Patentamt | 2023
|