Obstacle removing construction method suitable for underground obstacles under complex geological conditions
The invention relates to the technical field of building construction, in particular to an obstacle removing construction method suitable for underground obstacles under complex geological conditions. Comprising the following steps: S1, leveling a site, and measuring and releasing point positions; s2, arranging an obstacle clearing well, and carrying out obstacle clearing operation; s3, performing recharging operation; s4, moving to a next position to be subjected to obstacle clearance, and repeating the steps S2 to S5 until the obstacle clearance is completed; the method can be suitable for obstacle clearing operation of various complex obstacles in various stratums, the advantages of steel sleeve retaining wall pore forming can be fully played, the method has high stability, safety and environmental protection performance, various harms caused by hole collapse to underground and overground buildings are avoided, and the method is suitable for large-scale popularization and application. And the safety of surrounding buildings and underground pipelines and the smooth development of subsequent construction operation are guaranteed.
本发明涉及建筑施工技术领域,具体涉及一种适用于地下障碍物复杂地质条件下的清障工法;包括以下步骤:S1场地平整,测放点位;S2设置清障井,并进行清障作业;S3回灌作业;S4移动到下一个待清障位置,重复步骤S2~S5,直至清障完成;本发明可适用于各种地层中的各类复杂障碍物的清障作业,可充分发挥出钢套管护壁成孔的优势,具有较高的稳定性、安全性及环保性,避免了塌孔对地下及地上建构筑物带来各项危害,保障了周围建构筑物及地下管线的安全以及后续施工作业的顺利开展。
Obstacle removing construction method suitable for underground obstacles under complex geological conditions
The invention relates to the technical field of building construction, in particular to an obstacle removing construction method suitable for underground obstacles under complex geological conditions. Comprising the following steps: S1, leveling a site, and measuring and releasing point positions; s2, arranging an obstacle clearing well, and carrying out obstacle clearing operation; s3, performing recharging operation; s4, moving to a next position to be subjected to obstacle clearance, and repeating the steps S2 to S5 until the obstacle clearance is completed; the method can be suitable for obstacle clearing operation of various complex obstacles in various stratums, the advantages of steel sleeve retaining wall pore forming can be fully played, the method has high stability, safety and environmental protection performance, various harms caused by hole collapse to underground and overground buildings are avoided, and the method is suitable for large-scale popularization and application. And the safety of surrounding buildings and underground pipelines and the smooth development of subsequent construction operation are guaranteed.
本发明涉及建筑施工技术领域,具体涉及一种适用于地下障碍物复杂地质条件下的清障工法;包括以下步骤:S1场地平整,测放点位;S2设置清障井,并进行清障作业;S3回灌作业;S4移动到下一个待清障位置,重复步骤S2~S5,直至清障完成;本发明可适用于各种地层中的各类复杂障碍物的清障作业,可充分发挥出钢套管护壁成孔的优势,具有较高的稳定性、安全性及环保性,避免了塌孔对地下及地上建构筑物带来各项危害,保障了周围建构筑物及地下管线的安全以及后续施工作业的顺利开展。
Obstacle removing construction method suitable for underground obstacles under complex geological conditions
一种适用于地下障碍物复杂地质条件下的清障工法
LIU FUHUA (Autor:in) / WANG HUAIDONG (Autor:in) / ZHANG MEIQIN (Autor:in) / YUAN YUNHUI (Autor:in) / YANG JINGSHENG (Autor:in) / CHENG SHUJIA (Autor:in)
18.06.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Obstacle removing and backfilling construction method for existing underground structure
Europäisches Patentamt | 2023
|Bridge foundation construction method suitable for complex geological conditions
Europäisches Patentamt | 2021
|Underground facility pipeline obstacle removing equipment
Europäisches Patentamt | 2022
|