Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steel formwork splicing equipment for building construction
The invention relates to the technical field of building construction, in particular to steel formwork splicing equipment for building construction, which comprises a base plate, four groups of positioning mechanisms are arranged on the base plate, and the four groups of positioning mechanisms are respectively used for pre-positioning bolt holes between adjacent steel formworks; the four sets of vertex angle pieces are installed on the base plate in a sliding mode, and the four sets of vertex angle pieces are used for synchronously centering and clamping the adjacent vertex angles of the first steel formwork, the second steel formwork, the third steel formwork and the fourth steel formwork correspondingly; the pressing pieces are installed on the base plate in a lifting mode, and the pressing pieces are used for leveling and pressing the tops of the frames of the first steel formwork, the second steel formwork, the third steel formwork and the fourth steel formwork; a driving box is arranged on the base plate, a driving mechanism is arranged in the driving box, and the driving mechanism is used for driving the four sets of vertex angle pieces to synchronously move inwards and driving the pressing pieces to descend at the same time; the problem that an abutted seam is too large or grout leaks due to hole position deviation is effectively solved, and the engineering quality and the construction progress are powerfully improved.
本发明涉及建筑施工的技术领域,特别是涉及一种建筑施工用钢模板拼接设备,包括:基板,基板上设置有四组定位机构,四组定位机构分别用于对相邻钢模板之间的螺栓孔进行预定位;顶角件,四组顶角件滑动安装在基板上,四组顶角件分别用于对钢模板一、钢模板二、钢模板三和钢模板四相邻顶角进行同步对中夹紧;按压件,按压件升降安装在基板上,按压件用于对钢模板一、钢模板二、钢模板三和钢模板四的边框顶部进行找平压紧;基板上设置有驱动箱,驱动箱内部设置有驱动机构,驱动机构用于驱动四组顶角件同步向内移动,同时驱动按压件下降;其有效防止因孔位偏差导致的拼缝过大或漏浆问题,有力提升工程质量和施工进度。
Steel formwork splicing equipment for building construction
The invention relates to the technical field of building construction, in particular to steel formwork splicing equipment for building construction, which comprises a base plate, four groups of positioning mechanisms are arranged on the base plate, and the four groups of positioning mechanisms are respectively used for pre-positioning bolt holes between adjacent steel formworks; the four sets of vertex angle pieces are installed on the base plate in a sliding mode, and the four sets of vertex angle pieces are used for synchronously centering and clamping the adjacent vertex angles of the first steel formwork, the second steel formwork, the third steel formwork and the fourth steel formwork correspondingly; the pressing pieces are installed on the base plate in a lifting mode, and the pressing pieces are used for leveling and pressing the tops of the frames of the first steel formwork, the second steel formwork, the third steel formwork and the fourth steel formwork; a driving box is arranged on the base plate, a driving mechanism is arranged in the driving box, and the driving mechanism is used for driving the four sets of vertex angle pieces to synchronously move inwards and driving the pressing pieces to descend at the same time; the problem that an abutted seam is too large or grout leaks due to hole position deviation is effectively solved, and the engineering quality and the construction progress are powerfully improved.
本发明涉及建筑施工的技术领域,特别是涉及一种建筑施工用钢模板拼接设备,包括:基板,基板上设置有四组定位机构,四组定位机构分别用于对相邻钢模板之间的螺栓孔进行预定位;顶角件,四组顶角件滑动安装在基板上,四组顶角件分别用于对钢模板一、钢模板二、钢模板三和钢模板四相邻顶角进行同步对中夹紧;按压件,按压件升降安装在基板上,按压件用于对钢模板一、钢模板二、钢模板三和钢模板四的边框顶部进行找平压紧;基板上设置有驱动箱,驱动箱内部设置有驱动机构,驱动机构用于驱动四组顶角件同步向内移动,同时驱动按压件下降;其有效防止因孔位偏差导致的拼缝过大或漏浆问题,有力提升工程质量和施工进度。
Steel formwork splicing equipment for building construction
建筑施工用钢模板拼接设备
XUAN HONGZHENG (Autor:in) / ZHANG JIANCHAO (Autor:in) / LIU JIANXIANG (Autor:in) / HUANG WEI (Autor:in) / ZHANG PENG (Autor:in)
21.06.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction engineering steel formwork splicing device and splicing method
Europäisches Patentamt | 2024
|