Method for monitoring horizontal displacement of embankment side pile
The invention discloses an embankment side pile horizontal displacement monitoring method. According to the method, the laser instruments and the intervisibility lighting targets are arranged at the boundaries of the two longitudinal ends of the embankment respectively, only two sets of laser instruments and intervisibility lighting targets need to be arranged at each embankment, the positioning lighting targets are arranged at the transverse boundaries of the embankment, laser beams are projected by the laser instruments to penetrate through the bull's eyes of the positioning lighting targets to reach the bull's eyes of the intervisibility lighting targets, and the laser beams are transmitted to the embankment. The distance between the side piles and the positioning lighting target at the section and the distance between the side piles can be measured, the problems that in a traditional method, time and labor are wasted and cost is wasted due to the fact that fixing piers need to be arranged at each monitoring section are solved, and if the monitoring sections are arranged according to specifications or design requirements, due to the fact that the monitoring sections are large in number, the monitoring accuracy is high. A large number of instrument fixing piers are manufactured, the instrument fixing piers need to be arranged on the two sides of each monitoring section, the problem that on-site construction is affected exists, the instrument fixing piers are easily interfered by construction machinery, and the continuity and accuracy of monitoring data are affected.
本发明公开了一种路堤边桩水平位移监测方法。本发明将激光仪和通视采光靶分别布设在路堤纵向两端边界,且在每个路堤处只需布设两组激光仪和通视采光靶,在路堤横向边界处布设定位采光靶,通过激光仪投射激光束穿过定位采光靶靶心到达通视采光靶的靶心处,即可测量断面处边桩与定位采光靶之间的距离,以及边桩与边桩之间的距离,解决了传统方法中需在每个监测断面处布设固定墩费时费力,浪费成本的问题,且若按照规范或设计要求布设监测断面,由于监测断面较多,制作仪器固定墩数量较多,须在每个监测断面两侧布设,存在影响现场施工的问题,且较易受施工机械干扰,而影响监测数据的连续性和准确性。
Method for monitoring horizontal displacement of embankment side pile
The invention discloses an embankment side pile horizontal displacement monitoring method. According to the method, the laser instruments and the intervisibility lighting targets are arranged at the boundaries of the two longitudinal ends of the embankment respectively, only two sets of laser instruments and intervisibility lighting targets need to be arranged at each embankment, the positioning lighting targets are arranged at the transverse boundaries of the embankment, laser beams are projected by the laser instruments to penetrate through the bull's eyes of the positioning lighting targets to reach the bull's eyes of the intervisibility lighting targets, and the laser beams are transmitted to the embankment. The distance between the side piles and the positioning lighting target at the section and the distance between the side piles can be measured, the problems that in a traditional method, time and labor are wasted and cost is wasted due to the fact that fixing piers need to be arranged at each monitoring section are solved, and if the monitoring sections are arranged according to specifications or design requirements, due to the fact that the monitoring sections are large in number, the monitoring accuracy is high. A large number of instrument fixing piers are manufactured, the instrument fixing piers need to be arranged on the two sides of each monitoring section, the problem that on-site construction is affected exists, the instrument fixing piers are easily interfered by construction machinery, and the continuity and accuracy of monitoring data are affected.
本发明公开了一种路堤边桩水平位移监测方法。本发明将激光仪和通视采光靶分别布设在路堤纵向两端边界,且在每个路堤处只需布设两组激光仪和通视采光靶,在路堤横向边界处布设定位采光靶,通过激光仪投射激光束穿过定位采光靶靶心到达通视采光靶的靶心处,即可测量断面处边桩与定位采光靶之间的距离,以及边桩与边桩之间的距离,解决了传统方法中需在每个监测断面处布设固定墩费时费力,浪费成本的问题,且若按照规范或设计要求布设监测断面,由于监测断面较多,制作仪器固定墩数量较多,须在每个监测断面两侧布设,存在影响现场施工的问题,且较易受施工机械干扰,而影响监测数据的连续性和准确性。
Method for monitoring horizontal displacement of embankment side pile
一种路堤边桩水平位移监测方法
YUAN FANGLONG (Autor:in) / CHEN YUNTAO (Autor:in) / ZHU NAN (Autor:in) / ZHAO DONGHUI (Autor:in) / WANG JIANNAN (Autor:in) / WANG JIAN (Autor:in) / YIN RUILONG (Autor:in) / ZHAO YAN (Autor:in)
25.06.2024
Patent
Elektronische Ressource
Chinesisch
DOAJ | 2023
|Europäisches Patentamt | 2018
|Model Tests on Performance of Displacement Pile during Embankment Construction
British Library Conference Proceedings | 2001
|Europäisches Patentamt | 2019
Seismic stability and displacement of an embankment and pile supported wharf
British Library Conference Proceedings | 1997
|