The invention provides a night dangerous rock treatment construction method which comprises the following steps: 1) arranging an approach construction road at the top of a dangerous rock body, carrying out excavation construction from top to bottom, forming a construction area after a slope of each step is supported, and then carrying out lower step construction; (2) a protective fence is arranged at the position, 1.5-2 m away from the sideline, of the outer side of the construction area; (3) a warning fence is arranged at the position 1-1.5 m away from the inner side of the protective fence; (4) a fracture is formed by the protective fence and the warning fence and serves as a discharging opening; (5) arranging a vehicle blocking ridge with the height of 1-1.5 m at the discharge port; 6, after the explosion materials excavated by the excavator are conveyed to the vehicle stopping ridge through the dump truck, the explosion materials are unloaded to the material collecting platform. By the adoption of the structure and the method, the problem that dangerous rock explosion excavation construction is blocked due to the fact that visibility is low at night and in rainy and foggy weather is effectively solved, and dangerous rock treatment construction safety under the special weather condition is guaranteed.
本发明提供了一种夜间危岩治理施工方法,包括以下步骤:1)危岩体顶部布置进场施工道路,由上向下遂层进行开挖施工,每台阶边坡完成支护后形成施工区域,再进行下部台阶施工;2)在施工区域外侧距边线1.5~2m位置处布置防护栏;3)防护拦内侧1~1.5m处布置警示栏;4)防护栏与警示栏形成断口,作为卸料口;5)在卸料口处布置高度1~1.5m的拦车埂;6)通过自卸汽车将挖掘机所开挖的爆破料输送至拦车埂处后,将爆破料卸载至集料平台上。采用上述结构及方法,有效解决了夜间及雨雾天气时,能见度较低所导致的危岩爆破开挖施工受阻问题,保障了特殊天气条件下的危岩治理施工安全。
Night dangerous rock treatment construction method
The invention provides a night dangerous rock treatment construction method which comprises the following steps: 1) arranging an approach construction road at the top of a dangerous rock body, carrying out excavation construction from top to bottom, forming a construction area after a slope of each step is supported, and then carrying out lower step construction; (2) a protective fence is arranged at the position, 1.5-2 m away from the sideline, of the outer side of the construction area; (3) a warning fence is arranged at the position 1-1.5 m away from the inner side of the protective fence; (4) a fracture is formed by the protective fence and the warning fence and serves as a discharging opening; (5) arranging a vehicle blocking ridge with the height of 1-1.5 m at the discharge port; 6, after the explosion materials excavated by the excavator are conveyed to the vehicle stopping ridge through the dump truck, the explosion materials are unloaded to the material collecting platform. By the adoption of the structure and the method, the problem that dangerous rock explosion excavation construction is blocked due to the fact that visibility is low at night and in rainy and foggy weather is effectively solved, and dangerous rock treatment construction safety under the special weather condition is guaranteed.
本发明提供了一种夜间危岩治理施工方法,包括以下步骤:1)危岩体顶部布置进场施工道路,由上向下遂层进行开挖施工,每台阶边坡完成支护后形成施工区域,再进行下部台阶施工;2)在施工区域外侧距边线1.5~2m位置处布置防护栏;3)防护拦内侧1~1.5m处布置警示栏;4)防护栏与警示栏形成断口,作为卸料口;5)在卸料口处布置高度1~1.5m的拦车埂;6)通过自卸汽车将挖掘机所开挖的爆破料输送至拦车埂处后,将爆破料卸载至集料平台上。采用上述结构及方法,有效解决了夜间及雨雾天气时,能见度较低所导致的危岩爆破开挖施工受阻问题,保障了特殊天气条件下的危岩治理施工安全。
Night dangerous rock treatment construction method
夜间危岩治理施工方法
TU SHENG (Autor:in) / WANG QING (Autor:in) / CHEN LIANG (Autor:in) / NIE LEI (Autor:in) / SUN ZHIWU (Autor:in) / WEN YAOYAO (Autor:in) / LI WEI (Autor:in) / LI CHAOYAN (Autor:in)
25.06.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
E04G
SCAFFOLDING
,
Baugerüste
Collapse dangerous rock treatment construction method
Europäisches Patentamt | 2021
|Super-huge type dangerous rock treatment construction method
Europäisches Patentamt | 2020
|Excavator night construction dangerous range warning device
Europäisches Patentamt | 2022
|Slope dangerous rock protection measure construction device and construction method
Europäisches Patentamt | 2024
|Progressive dangerous rock damage treatment structure and treatment method
Europäisches Patentamt | 2022
|